14 KiB
Project Plan: TirSystem Reusable Workflows
Metadata
| Key | Value |
|---|---|
| ID | PP-001 |
| CrossReference | BC-001, SA-001, MIL-001, MIL-002, MIL-003, MIL-004 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-03 | Rejected | Jens Tirsvad Nielsen | S01 | Initial version Added use case candidates and prioritisation appendix |
4de5438 |
| 2026-10-03 | Accepted | Jens Tirsvad Nielsen | S01 | Owner of every gateway is S05 Actors updated |
4de5438 |
Purpose
This plan schedules four milestones that move the repository from one workflow with known defects to a documented, versioned collection of shared workflows. The Business Case sets no deadline, so the dates are proposals.
Planning Assumptions
- Week 1 starts 2026-10-05; phases are two weeks long; the last decision is 2026-11-28.
- Work on a milestone starts only after its
MIL-*document isAccepted. - Dates are proposed by the author and need confirmation by S01 and S05.
Gateway Schedule
| Gateway | Document | Window | Decision date | Owner | Stories | Main deliverable | Milestone |
|---|---|---|---|---|---|---|---|
| Stabilise the metadata sync | MIL-001 | 2026-10-05 to 2026-10-17 | 2026-10-17 | S05 | None yet | Single tested workflow, accurate README | Milestone MIL-001 |
| Onboarding and operations guide | MIL-002 | 2026-10-19 to 2026-10-31 | 2026-10-31 | S05 | None yet | Verified onboarding, credential and diagnosis guide | Milestone MIL-002 |
| Shared quality checks | MIL-003 | 2026-11-02 to 2026-11-14 | 2026-11-14 | S05 | None yet | Reusable quality-check workflow | Milestone MIL-003 |
| Versioned release and publishing | MIL-004 | 2026-11-16 to 2026-11-28 | 2026-11-28 | S05 | None yet | Release process and reusable release workflow | Milestone MIL-004 |
@startgantt
Project starts 2026-10-05
[MIL-001 Stabilise] starts 2026-10-05 and ends 2026-10-17
[MIL-002 Onboarding] starts 2026-10-19 and ends 2026-10-31
[MIL-003 Quality checks] starts 2026-11-02 and ends 2026-11-14
[MIL-004 Release] starts 2026-11-16 and ends 2026-11-28
[MIL-001 Go/No-Go] happens 2026-10-17
[MIL-002 Go/No-Go] happens 2026-10-31
[MIL-003 Go/No-Go] happens 2026-11-14
[MIL-004 Go/No-Go] happens 2026-11-28
@endgantt
Scope Coverage
| Business Case scope item | Gateway |
|---|---|
| Validation of workflow files and their documentation | MIL-001 |
| Documentation for DevOps professionals | MIL-002 |
| Gitea Actions workflows for software engineers (quality checks) | MIL-003 |
| Gitea Actions workflows for software engineers (release and publishing) | MIL-004 |
Dependencies
MIL-001 → MIL-002 → MIL-003 → MIL-004
A No-Go moves every later window by the rework time of the failed milestone.
Plan Risks
| Risk | Impact | Mitigation |
|---|---|---|
| Reusable workflow support is missing on the instance | MIL-003 and MIL-004 change shape | Verify first in each milestone (MIL-002 task 2, MIL-003 task 1); fall back to copied templates. |
| Security review by S05 is a bottleneck | Milestone decisions slip | Keep milestones small and plan review time before each decision date. |
Open Issues
- Confirm the proposed dates and the start week (S01 and S05).
- Decide the behavior for an invalid push mirror response (MIL-001 task 1).
- Decide the canonical location of the workflow source (MIL-001 task 3).
- No QC checklist exists for the Project Plan.
- Formal use cases need a use case diagram and user stories first; neither exists yet.
Appendix: Use Case Candidates and Prioritisation
This appendix evaluates the candidate use cases against the repository as it is today. It is analysis, not a use case document; formal use cases follow in MIL-002 task 1. Priority: P1 do first, P2 next, P3 later.
Recommended order: (1) Synchronize repository metadata, because it is the only implemented capability and has a defect, (2) Configure workflow credentials, (3) Onboard a repository, (4) Diagnose a failed workflow, then (5) Run project quality checks and (6) Release a reusable workflow. The first four make the existing workflow dependable and adoptable; the others add new workflows and only pay off once adoption works.
Current repository state used for the status column: one workflow
(sync-github-metadata), one manual probe script (tests/test_.ps1), no CI,
no tests, no release process.
| # | Use case | Actor | Priority | Status today |
|---|---|---|---|---|
| 1 | Synchronize repository metadata | DevOps professional (S05) | P1 | Implemented in .gitea/scoped_workflows/; script has a syntax error |
| 2 | Configure workflow credentials | DevOps professional (S05, S03) | P1 | Partial: secrets are format-checked only |
| 3 | Onboard a repository to standard workflows | DevOps professional (S05) | P1 | Not documented; scoped workflow support unverified |
| 4 | Diagnose a failed workflow | DevOps professional (S05, S03) | P1 | Partial: errors are messages only, uncategorized |
| 5 | Run project quality checks | Software engineer (S02) | P2 | Planned |
| 6 | Release a reusable workflow | DevOps professional (S05) | P2 | Planned |
| 7 | Manage workflow runners | DevOps professional (S03, S05) | P2 | Partial: only ubuntu-latest with python3 assumed |
| 8 | Consume a workflow update | Software engineer (S02) | P2 | Planned; needs versioning |
| 9 | Review workflow results | Software engineer (S02) | P3 | Gitea provides logs; guidance planned |
| 10 | Create a project workflow | Software engineer (S02) | P3 | Planned; needs MIL-003 |
| 11 | Build and publish an artifact | Software engineer (S02) | P3 | Planned; destination undecided |
| 12 | Publish a release | Software engineer (S02) | P3 | Planned; overlaps with use case 6 and 11 |
UC candidate 1: Synchronize repository metadata (P1)
- Actor: DevOps professional. Goal: the GitHub mirror shows the Gitea description and topics.
- Trigger: push to
main, manual dispatch, or daily at 03:17 UTC. - Preconditions: both secrets set; exactly one GitHub push mirror configured; runner available.
- Success: description and topics on GitHub equal those on Gitea.
- Main flow: the workflow validates the secrets, reads description and topics from Gitea, finds the single GitHub mirror, updates the description, replaces the topics.
- Alternatives and failures: missing or invalid secret: fail with a message; zero or several GitHub mirrors: fail; non-list mirror response: behavior undecided (MIL-001 task 1); Gitea or GitHub API error: fail with the HTTP code.
- Dependencies: none.
UC candidate 2: Configure workflow credentials (P1)
- Actor: DevOps professional. Goal: least-privilege tokens that a workflow accepts.
- Trigger: onboarding a repository or rotating a token.
- Preconditions: access to Gitea and GitHub settings.
- Success: a workflow run passes credential checks with the documented minimum permissions.
- Main flow: create the tokens, store
TOKEN_FOR_GITEAandCREDENTIALS_FOR_GITHUB, run the workflow, read the validation result. - Alternatives and failures: malformed JSON, empty value, expired token, missing permission: the check names the category without printing the secret.
- Dependencies: use case 1.
UC candidate 3: Onboard a repository to standard workflows (P1)
- Actor: DevOps professional. Goal: a repository consumes the shared workflows.
- Trigger: a new or existing repository needs standard automation.
- Preconditions: Actions enabled; runner available; secrets possible to set.
- Success: the first run in the repository passes using only the guide.
- Main flow: choose scoped or copied delivery, set secrets, configure the push mirror, trigger a run.
- Alternatives and failures: scoped workflows unsupported: use a copied template; no runner: see use case 7.
- Dependencies: use cases 1 and 2; verification of scoped workflow support.
UC candidate 4: Diagnose a failed workflow (P1)
- Actor: DevOps professional. Goal: find the cause of a failed run.
- Trigger: a failed or missing run.
- Preconditions: access to the run log.
- Success: the cause is placed in one category: configuration, credentials, permissions, API response or runner.
- Main flow: open the log, read the categorized message, look up the category in the guide, apply the fix, re-run.
- Alternatives and failures: no run starts: check runner and trigger; message uncategorized: raise as a defect.
- Dependencies: use cases 1 and 2.
UC candidate 5: Run project quality checks (P2)
- Actor: software engineer. Goal: tests, lint, format and type checks run on every change.
- Trigger: pull request or push.
- Preconditions: shared workflow available; project onboarded.
- Success: a status check reports pass or fail.
- Main flow: the shared workflow detects inputs, runs the checks, reports the result.
- Alternatives and failures: a check fails: the log names tool, file and message; unsupported language: workflow fails with a clear message.
- Dependencies: use case 3; reusable workflow support.
UC candidate 6: Release a reusable workflow (P2)
- Actor: DevOps professional. Goal: a validated, versioned workflow update that consumers can pin.
- Trigger: a workflow change is ready.
- Preconditions: validation checks exist; version scheme defined.
- Success: a tag and changelog entry exist and pinned consumers are unaffected.
- Main flow: run validation, update the changelog, tag, announce.
- Alternatives and failures: validation fails: no tag; breaking change: new major version.
- Dependencies: use case 1 (validation from MIL-001).
UC candidate 7: Manage workflow runners (P2)
- Actor: DevOps professional (runner operator). Goal: workflows run on a supported runner.
- Trigger: a job waits, fails to start, or a new label is needed.
- Preconditions: access to the runner list.
- Success: a runner with the required label and tools is online.
- Main flow: compare the workflow's
runs-onlabel with online runners, check prerequisites such aspython3, fix or register a runner. - Alternatives and failures: runner offline: restart or replace; label missing: add the label or change the workflow.
- Dependencies: use case 3.
UC candidate 8: Consume a workflow update (P2)
- Actor: software engineer. Goal: adopt a new workflow version safely.
- Trigger: a new release or a changelog notice.
- Preconditions: releases are versioned and have a changelog.
- Success: the project uses the new version and its pipeline still passes.
- Main flow: read the changelog, change the pinned version in one branch, run, merge.
- Alternatives and failures: breaking change: follow upgrade notes; failure: roll back to the previous pin.
- Dependencies: use case 6.
UC candidate 9: Review workflow results (P3)
- Actor: software engineer. Goal: understand a failed check and make it pass.
- Trigger: a failed status check on a pull request.
- Preconditions: a run exists.
- Success: the next run passes.
- Main flow: open the check, read the failing step, fix locally, push.
- Alternatives and failures: the cause is infrastructure, not code: hand over to use case 4.
- Dependencies: use case 5.
UC candidate 10: Create a project workflow (P3)
- Actor: software engineer. Goal: compose shared workflows into a project pipeline.
- Trigger: a project needs build and delivery steps.
- Preconditions: shared workflows are documented with inputs.
- Success: the project workflow runs the chosen shared workflows in order.
- Main flow: pick workflows, set inputs, set triggers and permissions, test.
- Alternatives and failures: missing input: the workflow fails with the input name.
- Dependencies: use cases 5 and 8.
UC candidate 11: Build and publish an artifact (P3)
- Actor: software engineer. Goal: a package or binary is built and published.
- Trigger: a tag or a manual run.
- Preconditions: destination decided; token with write access.
- Success: the artifact is available at the destination with a version.
- Main flow: build, test, package, publish, report the location.
- Alternatives and failures: publish denied: permission failure; version exists: fail without overwrite.
- Dependencies: use cases 5 and 6; destination decision (MIL-004 task 4).
UC candidate 12: Publish a release (P3)
- Actor: software engineer. Goal: a release with validated version and notes.
- Trigger: a version tag.
- Preconditions: changelog entry exists.
- Success: a release page with notes from the changelog.
- Main flow: validate the version, build notes, create the release.
- Alternatives and failures: invalid version or missing notes: fail. This overlaps with use cases 6 and 11 and should be merged with one of them when the use cases are written.
- Dependencies: use cases 6 and 11.