Task 1: both forms of uses: resolve a subfolder action at main. Adds ADR-0011
(Proposed, not yet reviewed), the review record RC-082 for the milestone
results, and the traceability rows.
Refs #182
Refs #190
Adds MIL-012 (accepted, RC-080), objective O6 to the Business Case (RC-081),
the schedule row, risk and dependency to the Project Plan, and the
traceability rows. The action code on this branch is not part of this commit.
The Release workflow created v2.1.1 and moved v2 (v1 unchanged); a call
at @v2 with the defaults ran after the release (run 1526). The
framework Badges page has no tools-ref workaround (framework pull
request 57). RC-079: Go, all eight criteria pass.
The fixed workflow at the branch, with every input at its default, ran
as run 1509: tools-ref resolved to v2, the scripts were fetched and the
badges were committed. RC-078 reviews the deliverables of tasks 2 to 5:
Go; criteria 6 to 8 stay open until the release and the framework page.
First read found three corrections: the wording of O5 in the
traceability, "ten milestones" in the plan's purpose, and a scope row that
is not a Business Case item. Go; accepted by the author as stand-in for
S01, not independent. MIL-011 and its plan row are Accepted; the
traceability matrix has the new rows.
All seven Go / No-Go criteria are met: framework v0.7.0, seven repositories
calling publish-wiki-pages.yml with 0-difference read-backs, no wiki/.publish
in 48 repositories, the scoped workflow removed, ADR-0004 superseded, 2.0.0
released with v1 left at 1.2.2. The acceptance is recorded as AI stand-in for
S01 (mode autonomous, not independent).
The scoped delivery and the wiki/.publish marker are replaced by the reusable
workflow of ADR-0009. The AI records the acceptance as stand-in for S01
(mode autonomous, not independent).
Task: MIL-009#7
The user switched to autonomous mode and accepted the plan in chat on
2026-10-14 with the defaults: target date 2026-11-30, no publishing for
027-sandbox and 028-pomodoro, framework release 0.7.0. The acceptance is
recorded as AI stand-in for S01 (RC-064, mode autonomous, not independent).
MIL-009 (migrate the wiki callers, remove the scoped workflow) joins the
Gateway Schedule, the Gantt, Scope Coverage, Dependencies and Plan Risks.
RC-064 records the review; MIL-009, the plan row and the record stay
Proposed until S01 gives the Go and confirms the target date.
RC-063 reviews ADR-0009 against QC-ADR-001: three findings fixed (stale
verification statement, security impact named, product owner spelled out).
S01 gave the Go in chat on 2026-10-13; ADR-0009 and RC-063 are Accepted.
S01 gave the Go on the MIL-008 plan change in chat on 2026-10-13. The change
was merged as pull request 137 with the plan row Proposed; this sets PP-001
and RC-062 to Accepted.
MIL-008 (wiki publishing as a reusable workflow) joins the Gateway Schedule,
the Gantt, Scope Coverage, Dependencies and Plan Risks. RC-062 records the
review; the plan row stays Proposed until S01 gives the Go.
MIL-008 plans publishing the wiki through a reusable workflow that reads
docs/wiki/. ADR-0009 records the decision. RC-060 accepts the plan; RC-061
accepts the amendment that deprecates the scoped workflow instead of
removing it, because eight repositories still publish through it.
Results and review (RC-059, autonomous, AI as stand-in for S01) added to the
milestone. The guides and their wiki pages now say that clang-tidy and dotnet
print absolute paths in the workspace of the runner.
Task: MIL-007#7
Closes#101
Amends the accepted milestone with task 6 and records the review as RC-058
(autonomous, AI as stand-in for S01). The fix itself follows in a second pull
request under the Task: MIL-006#6 trailer.