Add objective 10 to the Business Case, US-001.06 and the use case, SSD, OC, SD, DM-001, DM-002, dictionary, DCD-001 and DCD-002 changes: a license set in config.env (PROJECT_LICENSE, a Gitea license key or none) applies with or without GitHub; when absent AGPL-3.0 applies only when GitHub is chosen. It is never asked, and a license the server does not offer stops the run before anything is created. Add milestone MIL-006 (8 Go/No-Go criteria, 4 tasks) and its phase in the Project Plan. All new rows are Proposed. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
4.3 KiB
4.3 KiB
Traceability Matrix
Metadata
| Key | Value |
|---|---|
| ID | TM-001 |
| CrossReference | BC-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S02 | Added MIL-005, RC-020 and RC-021 | ded26a6 |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S02 | Added MIL-006 | pending |
Purpose
Tracks backward/forward links between artifact instances so that the Business Case's cross-artifact traceability success criterion is measurable. A row is added or updated whenever an artifact instance is created or reviewed.
Traceability Table
Coverage Notes
- Reviewed so far: every artifact in the project (see the Last Reviewed column).
- No ERD, KPI, BMC or BPMN exists yet.
-in Downstream means nothing is built on the artifact yet.