1.6 KiB
1.6 KiB
System Sequence Diagram
Metadata
| Key | Value |
|---|---|
| ID | SSD-001 |
| CrossReference | UC-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-05 | Proposed | Jens Tirsvad Nielsen | S02 | Initial version | 424f14f |
Source Use Case
Create a new project (UC-001) — scenario: main success scenario
Diagram
@startuml
actor Maintainer as A
participant ":System" as S
A -> S : startProjectCreation()
S --> A : prompts for project details
A -> S : provideProjectDetails(name, description, visibility, githubOwner, giteaOwner, directory, enablePlanGate)
S --> A : checks passed
S --> A : creation summary
@enduml
System Operations
| Step | Message | Parameters | Return | Use case step |
|---|---|---|---|---|
| 1 | startProjectCreation | none | prompts for project details (after configuration and tool checks) | 1, 2 |
| 2 | provideProjectDetails | name, description, visibility, githubOwner, giteaOwner, directory, enablePlanGate | checks passed, then a creation summary | 3 to 10 |
Steps 4 to 9 are internal to the system, so one operation covers them. A consent question (step 8a, 9a, 9b) is a prompt from the system and is out of scope for this diagram; failure flows are out of scope here.
Lifecycle Notes
The system is one script run. It starts with the first operation and ends after the summary; nothing persists between runs.