6.0 KiB
SQA Review Record: Gitea is the only remote
Metadata
| Key | Value |
|---|---|
| ID | RC-031 |
| CrossReference | MIL-008, QC-MIL-001, MIL-003, BC-001, US-001, UC-001, OC-001, SD-001, DCD-001, DCD-002, DM-001, DM-002, PP-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-08 | Proposed | Jens Tirsvad Nielsen | S02 | Initial version | 039a28c |
Artifact Under Review
- Instance reviewed: MIL-008, and the changes it causes in MIL-003, BC-001, US-001, UC-001, OC-001, SD-001, DCD-001, DCD-002, DM-001, DM-002, PP-001 and TM-001.
- Why: a project created by the script had two remotes,
origin(Gitea) andgithub. The documents required the second one when GitHub was chosen (objective 4, US-001.03, step 8 of UC-001, P9 of OC-001). Gitea already pushes to GitHub through the push mirror, so the second remote is not needed and invites a push that goes around the mirror. The Business Case already expects "a push tooriginappears on GitHub" (success criterion 3 of BC-001). - Checklist used: QC-MIL-001 for MIL-008. The other artifacts were changed, not created; their change is checked below.
- Review date: 2026-10-08
Checklist Results (QC-MIL-001)
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | A concrete deliverable is defined for every gate | Pass | The script that adds origin only, the documents that agree with it, the README and the tests. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Six criteria, each with an objective Go and No-Go: the remote list with and without GitHub, the contents of .git/config, an existing github remote kept, the other steps unchanged, the documents in agreement, and the acceptance criteria of US-001.03. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | MIL-002 (the mirror makes the second remote unnecessary) and MIL-003 (the step that changes), each with its reason. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Objective 4 and success criteria 1 and 3 of BC-001, and US-001.03. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner S01, approving reviewer S02. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | 2026-12-18, proposed in PP-001; the Business Case sets no deadline. |
Change checks on the other artifacts
| Artifact | Change | Status | Evidence/Notes |
|---|---|---|---|
| BC-001 | Objective 4 names origin as the only remote |
Pass | Success criterion 3 already says a push to origin appears on GitHub. |
| US-001 | US-001.03 acceptance criterion; MIL-008 added to the CrossReference | Pass | One given/when/then; it says there is no github remote and why. |
| UC-001 | Postcondition, step 8 and the rule for step 8; the rule for steps 3, 5 and 7 no longer names the remote | Pass | The rule says an existing remote of another name is never removed or replaced. |
| OC-001 | P9 | Pass | Numbering is kept: P9 now says no other remote was associated, so the references to P10 to P14 in SD-001 and DCD-002 still hold. |
| SD-001 | build(directory, giteaRepository, sshPassed), the returned localProject (remote origin) and the P9 row |
Pass | The GitHub repository is no longer passed to LocalProjectBuilder. |
| DCD-001, DCD-002 | build loses its target parameter; Remote lists origin only; a Local Project has 1 Remote; the build mapping row |
Pass | Names match SD-001; the class table and the mapping table agree with the diagram. |
| DM-001, DM-002 | A Local Project has 1 Remote (was 1..2); the Remote description | Pass | Names unchanged. The dictionary needs no change: the term Remote and its definition do not name github. |
| MIL-003 | Criterion 1 and task 1 | Pass | They now say origin only and point to MIL-008. |
| PP-001 | Phase MIL-008, its window, the Gantt, the scope coverage and the dependency chain | Pass | Proposed dates 2026-12-14 to 2026-12-18. |
| TM-001 | Rows for MIL-008 and this record; Last Reviewed updated | Pass | See the matrix. |
The code, the README and the tests (the three tasks of MIL-008) were changed after S01 waived the plan in chat for this request, so the milestone was not synced as issues first. create_local_project adds origin only, github_remote_url is gone, the README describes the one remote, and tests/test-local.sh checks the remote list with and without GitHub, no GitHub address in .git/config, and a github remote from an earlier version kept. The full suite passed with 1141 checks and no failed static check. Criterion 5 of MIL-008 is still for S02 to check against the documents.
Overall Verdict
Pending S02 — drafted by Claude Code for S02. The documents, the code, the README and the tests agree with each other. On a Go from S02 the Version History rows of the changed documents become Accepted and the rows before them Deprecated.
Action Items
| Action | Owner | Due |
|---|---|---|
| Confirm the verdict and the proposed dates of MIL-008 | S02 | 2026-10-15 |
| Decide whether to sync the tasks of MIL-008 as issues now that the work is done (the plan was waived for this change) | S01 | 2026-10-15 |