Add objective 8 to the Business Case, US-001.04, extensions 3a and 3b of UC-001 and the matching SSD, OC, SD, DM-001 and DM-002 notes. Add the phase to the Project Plan and the milestone MIL-004 with eight Go/No-Go criteria and five tasks (issues #27 to #31). Review recorded in RC-018. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
54 lines
2.1 KiB
Markdown
54 lines
2.1 KiB
Markdown
# System Sequence Diagram
|
|
|
|
## Metadata
|
|
| Key | Value |
|
|
| --- | --- |
|
|
| ID | SSD-001 |
|
|
| CrossReference | [UC-001], [DM-001], [OC-001] |
|
|
|
|
## Version History
|
|
| Date | Status | Author | Reviewer | Change | Commit |
|
|
| --- | --- | --- | --- | --- | --- |
|
|
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S02 | Optional GitHub; choosing GitHub applies the AGPL license to the Gitea repository<br>Cited OC-001 and DM-001 | [02875ae] |
|
|
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S02 | Parameters may come from config.env; the message is unchanged | pending |
|
|
|
|
---
|
|
|
|
## Source Use Case
|
|
|
|
Create a new project ([UC-001]) — scenario: main success scenario
|
|
|
|
## Diagram
|
|
|
|
```plantuml
|
|
@startuml
|
|
actor Maintainer as A
|
|
participant ":System" as S
|
|
A -> S : startProjectCreation()
|
|
S --> A : prompts for project details
|
|
A -> S : provideProjectDetails(name, description, visibility, giteaOwner, githubOwner, directory, enablePlanGate)
|
|
S --> A : checks passed
|
|
S --> A : creation summary
|
|
@enduml
|
|
```
|
|
|
|
## System Operations
|
|
|
|
| Step | Message | Parameters | Return | Use case step |
|
|
| --- | --- | --- | --- | --- |
|
|
| 1 | startProjectCreation | none | prompts for project details (after configuration and tool checks) | 1, 2 |
|
|
| 2 | provideProjectDetails | name, description, visibility, giteaOwner, githubOwner (optional; given means GitHub is chosen and the Gitea repository gets the AGPL license; omitted means no GitHub and no license), directory, enablePlanGate (each of these may come from `config.env` instead of the Maintainer; the message is unchanged) | checks passed, then a creation summary | 3 to 10 |
|
|
|
|
Steps 4 to 9 are internal to the system, so one operation covers them. A consent question (step 8a, 9a, 9b) is a prompt from the system and is out of scope for this diagram; failure flows are out of scope here.
|
|
|
|
## Lifecycle Notes
|
|
|
|
The system is one script run. It starts with the first operation and ends after the summary; nothing persists between runs.
|
|
|
|
---
|
|
|
|
[UC-001]: ./uc.md
|
|
[DM-001]: ./dm.md
|
|
[OC-001]: ./oc.md
|
|
[02875ae]: https://git.tirsystem.com/TirSystem-BashScript/repo_foundry/commit/02875aee5f2953473924074eea0056eb31af6b7a
|