SQA Review Record: PP-001

Metadata

Key Value
ID RC-012
CrossReference PP-001

Version History

Date Status Author Reviewer Change Commit
2026-10-05 Proposed Jens Tirsvad Nielsen S02 Initial version 02875ae

Artifact Under Review

  • Instance reviewed: PP-001
  • Checklist used: none: no QC checklist exists for PP; the checks below come from the PP reference (Required sections, Validating)
  • Review date: 2026-10-05

Checklist Results

# Criterion Status Evidence/Notes
1 Required sections are present in order Pass All eight required sections are present, in order.
2 Gateway Schedule agrees with each MIL-* (window, decision date, owner) Pass Three rows, one per MIL-*; windows, decision dates and owners match each milestone.
3 Timeline diagram shows each phase and Go/No-Go decision Pass The Gantt has one bar and one Go/No-Go marker per phase.
4 Plan fits the Business Case constraint Pass The Business Case sets no duration constraint, so there is no conflict; the plan states its dates are accepted by S01.
5 Scope Coverage maps each Business Case scope item to a gateway Pass Every in-scope item of BC-001 maps to a gateway.
6 Dependencies and the effect of a No-Go are stated Pass The chain MIL-001, MIL-002, MIL-003 and the effect of a No-Go are stated.
7 Owners use stakeholder IDs Pass Owners are S01 and S02.
8 Stories column matches the stories each gateway delivers Pass US-001.01, .02 and .03 match the milestones that deliver them.
9 Open Issues is accurate Pass Open Issues lists one open item (first commit), assigned to MIL-003.

Overall Verdict

Go — All checks pass. PP has no QC checklist, so the checks come from the PP reference (required sections and Validating). Author and reviewer are the same person for now (S01 and S02 are both held by the Maintainer), so the framework independence rule is not met; re-review when a second person takes S02.

Action Items

Action Owner Due
None - -