SQA Review Record: Project Plan

Metadata

Key Value
ID RC-003
CrossReference PP-001

Version History

Date Status Author Reviewer Change Commit
2026-10-04 Accepted Jens Tirsvad Nielsen S01 Initial version a1ff735

Artifact Under Review

  • Instance reviewed: PP-001
  • Checklist used: none exists for this type (PP has no QC checklist); criteria below follow references/PP.md "Validating".

Checklist Results

# Criterion Status Evidence/Notes
1 Every MIL-* gateway is scheduled Pass MIL-001 to MIL-004 listed with window, decision date and owner.
2 Schedule is consistent with the Business Case constraint Pass Ends 2026-10-14, matching the target-date constraint added to BC-001.
3 Gateway Schedule, Gantt, Scope Coverage, Dependencies, Plan Risks and Open Issues sections are present Pass All required sections present.
4 Each phase links to its synced Milestone Pass Milestones 36–39 linked.
5 Every Business Case scope item maps to a gateway Pass Scope Coverage table.

Overall Verdict

Go — no QC checklist exists for PP, so the plan was checked against BC-001 and the MIL-* documents. Open issues (README template, Python version, dates) remain listed in the plan. Reviewer and author are both S01: the project has a single participant, so the framework's author/reviewer separation cannot be met. S01 accepted this deviation when requesting acceptance (2026-10-04).

Action Items

Action Owner Due
Provide README template before MIL-004 task 1 S01 2026-10-13
Confirm requires-python (>=3.13 or 3.14+) S01 2026-10-06