Author SHA1 Message Date
Tirsvad 923dde7dc9 Accept MIL-003 and add the Play a Game use case
Create the use case chain for the game loop task: Use Case Diagram
UCD-001, User Stories US-001 (two stories), Use Case UC-001 and System
Sequence Diagram SSD-001, all Proposed. Link them from MIL-003.

Review MIL-003 (RC-006, Go) and accept it. Add the new artifacts to the
Traceability Matrix and register UCD, US, UC and SSD in the artifact
registry.

Refs #13
2026-10-04 23:41:35 +08:00
TirsvadandClaude Sonnet 5.5 037900df94 Resolve pending commit links for MIL-002 acceptance
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-04 23:35:18 +08:00
Tirsvad ee58fcdc1c Add game data, art, constants and game logic
Add the assignment data set (50 accounts), the logo and vs art, the
constants module, and the pure functions get_random_account,
pick_pair, format_data and check_answer, all with Doxygen comments.
pick_pair never returns the same account twice; check_answer accepts
either choice on a tie. Cover them with pytest tests (22 passing).

The art is built from concatenated raw lines so the backslashes survive
and Doxygen does not read the backticks as markup.

Accept MIL-002 after review RC-005 and add it to the Traceability
Matrix.

Task: MIL-002#1
Task: MIL-002#2
Task: MIL-002#3
Task: MIL-002#4
Task: MIL-002#5
Task: MIL-002#6
Closes #6
Closes #7
Closes #8
Closes #9
Closes #10
Closes #11
2026-10-04 23:34:48 +08:00
TirsvadandClaude Sonnet 5.5 529b964481 Resolve pending commit links for accepted documents
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-04 23:23:54 +08:00
Tirsvad a1ff73580f Accept BC, SA, PP and MIL-001 after review
Review BC-001, SA-001, PP-001 and MIL-001 and record the results as
RC-001 to RC-004. All four verdicts are Go, so their Version History
rows become Accepted and the previous rows Deprecated. MIL-002 to
MIL-004 stay Proposed.

BC-001 failed criterion 1 (cost-benefit not justified as qualitative).
Add the justification and a target-completion constraint (2026-10-14)
that PP-001 and MIL-001 are checked against.

Add the Traceability Matrix (TM-001) and register RC and TM in the
artifact registry. PP has no QC checklist, so RC-003 checks the plan
against BC-001 and the milestones instead. Author and reviewer are
both S01, a deviation noted in each record.

Refs #5
2026-10-04 23:23:12 +08:00