Create the use case chain for the game loop task: Use Case Diagram
UCD-001, User Stories US-001 (two stories), Use Case UC-001 and System
Sequence Diagram SSD-001, all Proposed. Link them from MIL-003.
Review MIL-003 (RC-006, Go) and accept it. Add the new artifacts to the
Traceability Matrix and register UCD, US, UC and SSD in the artifact
registry.
Refs #13
Add the assignment data set (50 accounts), the logo and vs art, the
constants module, and the pure functions get_random_account,
pick_pair, format_data and check_answer, all with Doxygen comments.
pick_pair never returns the same account twice; check_answer accepts
either choice on a tie. Cover them with pytest tests (22 passing).
The art is built from concatenated raw lines so the backslashes survive
and Doxygen does not read the backticks as markup.
Accept MIL-002 after review RC-005 and add it to the Traceability
Matrix.
Task: MIL-002#1
Task: MIL-002#2
Task: MIL-002#3
Task: MIL-002#4
Task: MIL-002#5
Task: MIL-002#6
Closes#6Closes#7Closes#8Closes#9Closes#10Closes#11
Review BC-001, SA-001, PP-001 and MIL-001 and record the results as
RC-001 to RC-004. All four verdicts are Go, so their Version History
rows become Accepted and the previous rows Deprecated. MIL-002 to
MIL-004 stay Proposed.
BC-001 failed criterion 1 (cost-benefit not justified as qualitative).
Add the justification and a target-completion constraint (2026-10-14)
that PP-001 and MIL-001 are checked against.
Add the Traceability Matrix (TM-001) and register RC and TM in the
artifact registry. PP has no QC checklist, so RC-003 checks the plan
against BC-001 and the milestones instead. Author and reviewer are
both S01, a deviation noted in each record.
Refs #5
Add the Business Case, Stakeholder Analysis and Project Plan, and four
milestones (MIL-001 Project setup, MIL-002 Game logic, MIL-003 Console
game, MIL-004 Documentation and release) with Go/No-Go criteria and
task tables.
Set the PO language to en in the artifact registry. Link the synced
Gitea Milestones (36-39) in the Project Plan. The 20 task rows were
synced as issues #1-#20.
Refs #5