Create the Business Case, Stakeholder Analysis (S01 course participant, S02 Udemy coursists, S03 GitHub viewers), Project Plan and the milestone documents MIL-001 (project setup, 6 tasks) and MIL-002 (game implementation, 8 tasks) for the console Blackjack game. Register PP and MIL in the artifact registry, set the PO language to en, and link the synced Gitea milestones in the Gateway Schedule. Refs #1 Refs #2 Refs #3 Refs #4 Refs #5 Refs #6 Refs #7 Refs #8 Refs #9 Refs #10 Refs #11 Refs #12 Refs #13 Refs #14
1.2 KiB
1.2 KiB
Operation Contract (OC)
Cite in CrossReference only if the instance exists (new-artifact.sh checks this for you):
- SSD — Required source: each contract traces to exactly one SSD message
- DM — Classes/associations named in pre/postconditions
- SD — Forward: the design realizing each contract's postconditions
Required sections (after Metadata / Version History)
One block per system operation, each containing:
- Operation — complete signature: name, parameter types, return type (must match the SSD message).
- Cross References — the SSD message it traces to (one contract per message) and the Domain Model concepts touched.
- Preconditions — required state before execution, expressed in Domain Model terms.
- Postconditions — state changes only, in Larman's style: instance created / instance associated / attribute modified. Declarative ("what"), never algorithmic ("how"); avoid vague text like "system processes the request".
- Exceptions — error conditions, each with the failing precondition.
Terminology
Use the IT terms from the dictionary (DICT), not the PO terms the Domain Model uses.