TirSystem/git-workflows: CI / secret-scan (push) Skipped
TirSystem/git-workflows: CI / validate (push) Skipped
TirSystem/git-workflows: CI / opengrep (push) Skipped
TirSystem/git-workflows: CI / release-check (push) Skipped
TirSystem/git-workflows: Publish wiki / publish-wiki (push) Skipped
TirSystem/git-workflows: Release / release (push) Skipped
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Skipped
TirSystem/git-workflows: Publish accepted milestones / publish (push) Skipped
TirSystem/git-workflows: Validate / validate (push) Skipped
4.1 KiB
4.1 KiB
SQA Review Record
Metadata
| Key | Value |
|---|---|
| ID | RC-006 |
| CrossReference | MIL-003, QC-MIL-001, QC-LANG-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-11-21 | Proposed | Jens Tirsvad Nielsen | Stand-in for S01 | Initial version | 587a239 |
Artifact Under Review
- Instance reviewed: MIL-003
- Checklist used: QC-MIL-001, and QC-LANG-001 for the PO language
- Scope: full review
- Language and domain: en / it
- Language reviewer: none; criteria 3, 5 and 9 were confirmed by the stand-in for S01, who reads the language
- Mode: autonomous, not independent (Stand-in for S01)
Checklist Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable names the README screenshots, the wiki in three languages and the reflection journal. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Six Go/No-Go criteria, each checkable by inspection or a command. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table lists MIL-002, which supplies the game and screenshots. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability table maps to Business Case objectives 4 and 5 and success criteria 5 and 6. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership table names S01 as owner and approving reviewer. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date 2026-11-28 is the end of the plan; no Business Case deadline conflicts. |
Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | The Metadata table has a Language row and a Domain row, and neither is a placeholder |
Pass | Language = en and Domain = it are set in the Metadata table. |
| 2 | Language is a BCP 47 code and Domain is a value from the registry's domain list |
Pass | en is a BCP 47 code; it is in the registry's domain list. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | Confirmed by the stand-in for S01 (reads English, knows the IT domain) on 2026-11-21 after reading the document. |
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register IT Executive English (registry); short, plain sentences without unexplained jargon. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Confirmed by the stand-in for S01 (reads English, knows the IT domain) on 2026-11-21 after reading the document. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Keys, headings, IDs and statuses are English. |
| 7 | No translated twin (<name>.<language>.md) exists beside the document |
Pass | No translated twin exists beside the document. |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | First version; no language change since. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | Confirmed by the stand-in for S01 (reads English, knows the IT domain) on 2026-11-21 after reading the document. |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | No unexplained abbreviations; MIL, BC, SA are defined by the framework IDs. |
Overall Verdict
Go — all QC-MIL-001 and QC-LANG-001 criteria pass; criteria 3, 5 and 9 of QC-LANG-001 were confirmed by S01 in chat. Stand-in review, not independent.
Action Items
| Action | Owner | Due |
|---|---|---|
| None | S01 | n/a |