# RC-001 review ## Metadata | Key | Value | | --- | --- | | ID | RC-001 | | CrossReference | [BC-001], [QC-BC-001] | ## Version History | Date | Status | Author | Reviewer | Change | Commit | | --- | --- | --- | --- | --- | --- | | 2026-11-06 | Accepted | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | [fe0f272] | --- ## Artifact Under Review - Instance reviewed: [BC-001] - Checklist used: [QC-BC-001] - Scope: full review - Language and domain: en / it - Language reviewer: none, the reviewer reads English and knows the IT domain - Mode: autonomous, not independent (the reviewer is `AI as stand-in for S01`) ## Checklist Results | # | Criterion | Status | Evidence/Notes | | --- | --- | --- | --- | | 1 | ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified | Pass | Cost–Benefit says the assessment is qualitative because there is no budget and no revenue | | 2 | Risks are identified with documented impact and mitigation | Pass | Four risks, each with impact and mitigation | | 3 | Success criteria are measurable, stating explicit targets rather than vague aspirations | Pass | Six success criteria with targets and measures, for example `python -m pytest` exits with 0 | | 4 | Scope explicitly separates In Scope vs Out of Scope | Pass | `### In Scope` and `### Out of Scope` are separate | | 5 | Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline | Pass | Stakeholders table cites S01, S02, S03 only | | 6 | Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) | Pass | Methodological and Standards Foundation names the framework, Larman and ISO/IEC 25010:2023 | | 7 | Assumptions and constraints are explicit and clearly distinguished from one another | Pass | Assumptions and Constraints are separate lists | | 8 | Document supports executive decision-making with a clear, unambiguous recommendation | Pass | Recommendation: Proceed, with a one-sentence rationale | ## Language and Domain Results | # | Criterion | Status | Evidence/Notes | | --- | --- | --- | --- | | 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | Metadata has `Language | en` and `Domain | it`, no placeholder | | 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | `en` is BCP 47; `it` is in the registry domain list | | 3 | The content (prose and table cells) is written in the stated language | Pass | BC-001 prose and table cells are in English | | 4 | The register matches the one the registry gives for the artifact type | Pass | Register is IT Executive English for BC, PP and MIL, IT Professional English for SA, as the registry gives | | 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Only standard IT terms are used (Flask, route, decorator, test); the project has no `DICT` and no PO-specific term needs one | | 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Metadata keys, headings, IDs and statuses are English | | 7 | No translated twin (`..md`) exists beside the document | Pass | No `.en.md`/`.da.md` twin exists beside the document | | 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | No change of language or domain; this is the first version | | 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | AI as stand-in for S01 read the terms as correct IT usage; S01 accepted the plan in chat on 2026-11-06. Stand-in decision, not independent; open to challenge in the run summary | | 10 | Abbreviations are spelled out on first use, in the stated language | Pass | Abbreviations (BC, SA, MIL, GIF, HTML, PR) are spelled out or are standard IT abbreviations | ## Overall Verdict Go — All Mandatory and Optional criteria pass for BC-001 and QC-LANG-001; no blocking finding. ## Action Items | Action | Owner | Due | | --- | --- | --- | | None | S01 | 2026-11-06 | --- [BC-001]: ../../docs/business-case.md [QC-BC-001]: ../../framework/qc/artifacts/qc-business-case.md [fe0f272]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/055-higher-lower/commit/fe0f2722c25220f6efa3b9b2f3d5e01e7f6d90dc