# Traceability Matrix ## Metadata | Key | Value | | --- | --- | | ID | TM-001 | | CrossReference | [BC-001], [SA-001], [PP-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004], [DICT-001], [RC-001], [RC-002], [RC-003], [RC-004], [RC-005], [RC-006], [RC-007], [RC-008] | ## Version History | Date | Status | Author | Reviewer | Change | Commit | | --- | --- | --- | --- | --- | --- | | 2026-11-04 | Proposed | Jens Tirsvad Nielsen | S01 (AI as stand-in) | Initial version | [4cd695e] | --- ## Purpose Tracks backward/forward links between artifact instances so that the Business Case's cross-artifact traceability success criterion is measurable. A row is added or updated whenever an artifact instance is created or reviewed. ## Traceability Table | Artifact Instance | Type | Language | Domain | Upstream (Backward Link) | Downstream (Forward Link) | Last Reviewed (RC-ID) | | --- | --- | --- | --- | --- | --- | --- | | [BC-001] | BC | en | it | - | [SA-001], [PP-001] | [RC-001] | | [SA-001] | SA | en | it | [BC-001] | [PP-001] | [RC-002] | | [PP-001] | PP | en | it | [BC-001], [SA-001] | [MIL-001], [MIL-002], [MIL-003], [MIL-004] | [RC-003] | | [DICT-001] | DICT | en | it | [BC-001] | - | [RC-004] | | [MIL-001] | MIL | en | it | [PP-001] | - | [RC-005] | | [MIL-002] | MIL | en | it | [PP-001], [MIL-001] | - | [RC-006] | | [MIL-003] | MIL | en | it | [PP-001], [MIL-002] | - | [RC-007] | | [MIL-004] | MIL | en | it | [PP-001], [MIL-003] | - | [RC-008] | ## Concern Coverage | Concern (CN-ID) | Views that answer it | Decisions (ADR) | Quality check (TP) | Status | | --- | --- | --- | --- | --- | | CN-001 | [MIL-002] | - | - | Gap | | CN-002 | [MIL-001], [MIL-002] | - | - | Gap | | CN-003 | [MIL-002] | - | - | Gap | | CN-004 | [MIL-001], [MIL-003] | - | - | Gap | | CN-005 | [MIL-001] | - | - | Gap | | CN-006 | [MIL-001] | - | - | Gap | | CN-007 | [MIL-002] | - | - | Gap | | CN-008 | [MIL-004] | - | - | Gap | ## Open Inconsistencies | # | Views | Inconsistency | Found in (RC-ID) | Status | Resolved in | | --- | --- | --- | --- | --- | --- | ## Coverage Notes No design views (use case, domain model, design class diagram) exist: the project models none, as [PP-001] states. A concern is `Gap` until the milestone that answers it is done. `-` in Upstream means foundational, in Downstream that nothing is built on it yet, and in Last Reviewed that no review record exists yet. --- [BC-001]: ../business-case.md [SA-001]: ../stakeholder-analysis.md [PP-001]: ../project-plan.md [DICT-001]: ../dictionary.md [MIL-001]: ../milestones/mil-001-project-setup.md [MIL-002]: ../milestones/mil-002-follower-bot.md [MIL-003]: ../milestones/mil-003-readme-and-screenshots.md [MIL-004]: ../milestones/mil-004-wiki.md [RC-001]: ./reviews/rc-001-bc.md [RC-002]: ./reviews/rc-002-sa.md [RC-003]: ./reviews/rc-003-pp.md [RC-004]: ./reviews/rc-004-dict.md [RC-005]: ./reviews/rc-005-mil-001.md [RC-006]: ./reviews/rc-006-mil-002.md [RC-007]: ./reviews/rc-007-mil-003.md [RC-008]: ./reviews/rc-008-mil-004.md [4cd695e]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/052-instagram-followers/commit/4cd695e8db91dd3f01f69e097cdf02098de2c144