Tirsvad 2b654dbb4d Close the release: link the milestones in the plan, final checks
Project Plan gateway schedule links the synced milestones and the open issues
are resolved. The wiki was published to the git host after the merge of the
documentation, and a clean clone installed, tested and ran the help command.

Closes #34
Closes #35
2026-10-28 18:10:53 +08:00
Tirsvad edb97de543 Merge pull request 'MIL-007: README, Doxygen and wiki in three languages' (#42) from mil-007-documentation into main
TirSystem/git-workflows: Publish wiki / publish-wiki (push) Successful in 28s
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Successful in 8s
2026-10-28 11:07:38 +01:00
+113 -108
View File
@@ -1,108 +1,113 @@
# Project Plan: Cookie Clicker Bot
## Metadata
| Key | Value |
| --- | --- |
| ID | PP-001 |
| CrossReference | [BC-001], [SA-001] |
| Language | en |
| Domain | it |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-28 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version: seven gateways; accepted by S01 in chat | [cadc5ef] |
---
## Purpose
This plan schedules seven gateways (`MIL-001` to `MIL-007`) that take the Cookie Clicker bot from an accepted baseline to a documented, tested and published repository. The Business Case sets no deadline, so the window 2026-10-28 to 2026-11-04 is a planning assumption of this plan. Each gateway ends in a decision and a deliverable and is delivered by one pull request on its own branch.
## Planning Assumptions
- Week 1 starts 2026-10-28; the plan ends by 2026-11-04 (a planning assumption, see Open Issues).
- Phase length: one day per gateway, except the baseline and documentation, which are longer. Gateways 003 to 006 follow the Udemy lecture steps 1 to 5.
- One branch and one pull request per gateway, each closing the issues of its tasks.
- The user stories and use case steps of the journey are skipped for this project (ADR-0001), so no gateway lists stories.
- Autonomous mode: S01 accepts this plan in chat; the AI acts as stand-in reviewer and records it in each `RC-*`.
## Gateway Schedule
| Gateway | Document | Window | Decision date | Owner | Stories | Main deliverable | Milestone |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Baseline and repository set-up | [MIL-001] | 2026-10-28 | 2026-10-28 | S01 | none (documents) | Accepted baseline, ADRs, repository description and topics | |
| Project scaffold and tooling | [MIL-002] | 2026-10-28 to 2026-10-29 | 2026-10-29 | S01 | none (technical tasks) | `pyproject.toml`, layout, `.gitignore`, Doxyfile, README, Docker image | |
| Lecture steps 1 and 2 | [MIL-003] | 2026-10-29 to 2026-10-30 | 2026-10-30 | S01 | none (technical tasks) | Open game, dismiss language, click cookie, screenshots 1 and 2 | |
| Lecture step 3 | [MIL-004] | 2026-10-30 to 2026-10-31 | 2026-10-31 | S01 | none (technical tasks) | Parsing, selection rule, purchase every 5 s, screenshot 3 | |
| Lecture step 4 | [MIL-005] | 2026-10-31 to 2026-11-01 | 2026-11-01 | S01 | none (technical tasks) | 5 minute run, cookies per second, screenshot 4 | |
| Lecture step 5 | [MIL-006] | 2026-11-01 to 2026-11-02 | 2026-11-02 | S01 | none (technical tasks) | Strategy options, comparison, screenshot 5 | |
| Documentation, wiki and release | [MIL-007] | 2026-11-02 to 2026-11-04 | 2026-11-04 | S01 | none (documentation) | README, Doxygen, wiki in en, da and ms, final checks | |
```plantuml
@startgantt
Project starts 2026-10-28
[Baseline] starts 2026-10-28 and ends 2026-10-28
[Scaffold] starts 2026-10-28 and ends 2026-10-29
[Steps 1 and 2] starts 2026-10-29 and ends 2026-10-30
[Step 3] starts 2026-10-30 and ends 2026-10-31
[Step 4] starts 2026-10-31 and ends 2026-11-01
[Step 5] starts 2026-11-01 and ends 2026-11-02
[Documentation] starts 2026-11-02 and ends 2026-11-04
[Baseline Go/No-Go] happens 2026-10-28
[Scaffold Go/No-Go] happens 2026-10-29
[Steps 1 and 2 Go/No-Go] happens 2026-10-30
[Step 3 Go/No-Go] happens 2026-10-31
[Step 4 Go/No-Go] happens 2026-11-01
[Step 5 Go/No-Go] happens 2026-11-02
[Release Go/No-Go] happens 2026-11-04
@endgantt
```
## Scope Coverage
| Business Case scope item | Gateway |
| --- | --- |
| Selenium bot for the game, with the assignment's function names | MIL-003, MIL-004, MIL-005 |
| Lecture steps 1 to 5 | MIL-003 (1 and 2), MIL-004 (3), MIL-005 (4), MIL-006 (5) |
| Python project files: `src/`, `tests/`, `docs/`, `pyproject.toml`, `constants.py`, `.gitignore`, Doxyfile, README | MIL-002, MIL-007 |
| Unit tests with `pytest` | MIL-002 to MIL-006 |
| One screenshot per lecture step in README and wiki | MIL-003 to MIL-006 (capture), MIL-007 (use) |
| Wiki in en, da and ms | MIL-007 |
| Repository description and topics | MIL-001 |
## Dependencies
```
MIL-001 → MIL-002 → MIL-003 → MIL-004 → MIL-005 → MIL-006 → MIL-007
```
A No-Go on a gateway stops all later gateways until it is fixed and re-reviewed. The end date then moves by the days spent on the rework; S01 decides a move of the end date.
## Plan Risks
| Risk | Impact | Mitigation |
| --- | --- | --- |
| The game changes its page structure (Business Case risk: page changes) | Steps 1 to 4 need rework | Selectors only in `constants.py`; the first task records the page as seen |
| The headless container cannot run the game well | Screenshots and the 5 minute run are late | Try the container in MIL-002; pin Chromium; fall back to a shorter duration constant for tests only |
| Stand-in review misses a defect | Defect reaches `main` | `RC-*` marks the review as not independent; S01 reviews the final summary |
| Translations take longer than planned | MIL-007 slips | Write English first; da and ms follow page by page; no extra pages |
## Open Issues
- Target repository: the user names `https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code`, but `origin` is `Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new`. The plan uses `origin` until S01 states otherwise in chat.
- The Business Case sets no deadline; the window 2026-10-28 to 2026-11-04 is this plan's own assumption.
- No QC checklist exists for the Project Plan acceptance beyond `QC-PP-001`; S01's acceptance of the plan in chat accepts the row.
---
[BC-001]: ./business-case.md
[SA-001]: ./stakeholder-analysis.md
[MIL-001]: ./milestones/mil-001-baseline.md
[MIL-002]: ./milestones/mil-002-scaffold.md
[MIL-003]: ./milestones/mil-003-click-bot.md
[MIL-004]: ./milestones/mil-004-buy-upgrades.md
[MIL-005]: ./milestones/mil-005-timed-run.md
[MIL-006]: ./milestones/mil-006-strategy.md
[MIL-007]: ./milestones/mil-007-documentation.md
[cadc5ef]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/commit/cadc5eff21d9afc09799d4bc2e3f6ac17ab2612a
# Project Plan: Cookie Clicker Bot
## Metadata
| Key | Value |
| --- | --- |
| ID | PP-001 |
| CrossReference | [BC-001], [SA-001] |
| Language | en |
| Domain | it |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-28 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version: seven gateways; accepted by S01 in chat | [cadc5ef] |
---
## Purpose
This plan schedules seven gateways (`MIL-001` to `MIL-007`) that take the Cookie Clicker bot from an accepted baseline to a documented, tested and published repository. The Business Case sets no deadline, so the window 2026-10-28 to 2026-11-04 is a planning assumption of this plan. Each gateway ends in a decision and a deliverable and is delivered by one pull request on its own branch.
## Planning Assumptions
- Week 1 starts 2026-10-28; the plan ends by 2026-11-04 (a planning assumption, see Open Issues).
- Phase length: one day per gateway, except the baseline and documentation, which are longer. Gateways 003 to 006 follow the Udemy lecture steps 1 to 5.
- One branch and one pull request per gateway, each closing the issues of its tasks.
- The user stories and use case steps of the journey are skipped for this project (ADR-0001), so no gateway lists stories.
- Autonomous mode: S01 accepts this plan in chat; the AI acts as stand-in reviewer and records it in each `RC-*`.
## Gateway Schedule
| Gateway | Document | Window | Decision date | Owner | Stories | Main deliverable | Milestone |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Baseline and repository set-up | [MIL-001] | 2026-10-28 | 2026-10-28 | S01 | none (documents) | Accepted baseline, ADRs, repository description and topics | [Milestone 1] |
| Project scaffold and tooling | [MIL-002] | 2026-10-28 to 2026-10-29 | 2026-10-29 | S01 | none (technical tasks) | `pyproject.toml`, layout, `.gitignore`, Doxyfile, README, Docker image | [Milestone 2] |
| Lecture steps 1 and 2 | [MIL-003] | 2026-10-29 to 2026-10-30 | 2026-10-30 | S01 | none (technical tasks) | Open game, dismiss language, click cookie, screenshots 1 and 2 | [Milestone 3] |
| Lecture step 3 | [MIL-004] | 2026-10-30 to 2026-10-31 | 2026-10-31 | S01 | none (technical tasks) | Parsing, selection rule, purchase every 5 s, screenshot 3 | [Milestone 4] |
| Lecture step 4 | [MIL-005] | 2026-10-31 to 2026-11-01 | 2026-11-01 | S01 | none (technical tasks) | 5 minute run, cookies per second, screenshot 4 | [Milestone 5] |
| Lecture step 5 | [MIL-006] | 2026-11-01 to 2026-11-02 | 2026-11-02 | S01 | none (technical tasks) | Strategy options, comparison, screenshot 5 | [Milestone 6] |
| Documentation, wiki and release | [MIL-007] | 2026-11-02 to 2026-11-04 | 2026-11-04 | S01 | none (documentation) | README, Doxygen, wiki in en, da and ms, final checks | [Milestone 7] |
```plantuml
@startgantt
Project starts 2026-10-28
[Baseline] starts 2026-10-28 and ends 2026-10-28
[Scaffold] starts 2026-10-28 and ends 2026-10-29
[Steps 1 and 2] starts 2026-10-29 and ends 2026-10-30
[Step 3] starts 2026-10-30 and ends 2026-10-31
[Step 4] starts 2026-10-31 and ends 2026-11-01
[Step 5] starts 2026-11-01 and ends 2026-11-02
[Documentation] starts 2026-11-02 and ends 2026-11-04
[Baseline Go/No-Go] happens 2026-10-28
[Scaffold Go/No-Go] happens 2026-10-29
[Steps 1 and 2 Go/No-Go] happens 2026-10-30
[Step 3 Go/No-Go] happens 2026-10-31
[Step 4 Go/No-Go] happens 2026-11-01
[Step 5 Go/No-Go] happens 2026-11-02
[Release Go/No-Go] happens 2026-11-04
@endgantt
```
## Scope Coverage
| Business Case scope item | Gateway |
| --- | --- |
| Selenium bot for the game, with the assignment's function names | MIL-003, MIL-004, MIL-005 |
| Lecture steps 1 to 5 | MIL-003 (1 and 2), MIL-004 (3), MIL-005 (4), MIL-006 (5) |
| Python project files: `src/`, `tests/`, `docs/`, `pyproject.toml`, `constants.py`, `.gitignore`, Doxyfile, README | MIL-002, MIL-007 |
| Unit tests with `pytest` | MIL-002 to MIL-006 |
| One screenshot per lecture step in README and wiki | MIL-003 to MIL-006 (capture), MIL-007 (use) |
| Wiki in en, da and ms | MIL-007 |
| Repository description and topics | MIL-001 |
## Dependencies
```
MIL-001 → MIL-002 → MIL-003 → MIL-004 → MIL-005 → MIL-006 → MIL-007
```
A No-Go on a gateway stops all later gateways until it is fixed and re-reviewed. The end date then moves by the days spent on the rework; S01 decides a move of the end date.
## Plan Risks
| Risk | Impact | Mitigation |
| --- | --- | --- |
| The game changes its page structure (Business Case risk: page changes) | Steps 1 to 4 need rework | Selectors only in `constants.py`; the first task records the page as seen |
| The headless container cannot run the game well | Screenshots and the 5 minute run are late | Try the container in MIL-002; pin Chromium; fall back to a shorter duration constant for tests only |
| Stand-in review misses a defect | Defect reaches `main` | `RC-*` marks the review as not independent; S01 reviews the final summary |
| Translations take longer than planned | MIL-007 slips | Write English first; da and ms follow page by page; no extra pages |
## Open Issues
- Resolved: S01 accepted the plan in chat on 2026-10-28; the target repository is `origin`, as S01 confirmed.
---
[BC-001]: ./business-case.md
[SA-001]: ./stakeholder-analysis.md
[MIL-001]: ./milestones/mil-001-baseline.md
[MIL-002]: ./milestones/mil-002-scaffold.md
[MIL-003]: ./milestones/mil-003-click-bot.md
[MIL-004]: ./milestones/mil-004-buy-upgrades.md
[MIL-005]: ./milestones/mil-005-timed-run.md
[MIL-006]: ./milestones/mil-006-strategy.md
[MIL-007]: ./milestones/mil-007-documentation.md
[cadc5ef]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/commit/cadc5eff21d9afc09799d4bc2e3f6ac17ab2612a
[Milestone 1]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/290
[Milestone 2]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/291
[Milestone 3]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/292
[Milestone 4]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/293
[Milestone 5]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/294
[Milestone 6]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/295
[Milestone 7]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory-new/milestone/296