Files
031-flash-card/docs/sqa/reviews/rc-004-use-case-diagram.md
T
Tirsvad c3fbcbcfaf Add the plan baseline: business case, stakeholders, plan, design and milestones
Business Case, Stakeholder Analysis, Project Plan, use case chain
(UCD, US, UC, DM, SSD, OC, SD, DCD, DICT), three ADRs, milestones
MIL-001 to MIL-007, the traceability matrix and 22 review records
(autonomous mode, AI as stand-in for S01).
2026-10-14 21:33:25 +08:00

4.7 KiB

RC-004: Review of UCD-001

Metadata

Key Value
ID RC-004
CrossReference UCD-001, QC-UCD-001, QC-LANG-001

Version History

Date Status Author Reviewer Change Commit
2026-10-14 Accepted Jens Tirsvad Nielsen AI as stand-in for S01 Initial version pending

Artifact Under Review

  • Instance reviewed: UCD-001
  • Checklist used: QC-UCD-001, and QC-LANG-001 (language and domain)
  • Scope: full review
  • Language and domain: en / it
  • Language reviewer: none (the stand-in for S01 reads the language and knows the domain)
  • Mode: autonomous, not independent (reviewer is AI as stand-in for S01)

Checklist Results

# Criterion Status Evidence/Notes
1 Actors are defined with correct UML stereotypes (e.g. <<System>>, <<Actor>>) Pass Actor table gives <<Actor>> and the diagram boundary carries <<System>>.
2 System boundary is clearly drawn and labeled Pass The boundary Flash Card is drawn and labelled.
3 Include/extend relationships are used correctly per UML 2.5.1, not as generic "uses" arrows Pass No include or extend is used; the table of Relationships says none, and why.
4 Every actor participates in at least one use case (no orphan actors) Pass The only actor, Learner, takes part in Study Flash Cards.
5 Diagram is traceable to a documented stakeholder need Pass The actor traces to S01 and S02 in the Actor Table.
6 Use case names are verb phrases describing actor goals, not internal system operations Pass Study Flash Cards is a verb phrase and an actor goal.
7 Diagram is free of implementation detail (e.g. UI widgets, database tables) Pass No widget, file or table appears in the diagram.
8 Actor and use case naming is consistent with corresponding Use Case and User Story documents Pass Names match UC-001 and US-001 (Learner, Study Flash Cards).

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Metadata of UCD-001 has `Language
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is a BCP 47 code and it is a value of the registry's domain list.
3 The content (prose and table cells) is written in the stated language Pass Prose and table cells are English; Malay and Danish words and file names appear only as quoted data.
4 The register matches the one the registry gives for the artifact type Pass The registry gives IT Professional English for this type; the text is written for that reader.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass The PO terms of DICT-001 (flash card, word list, words to learn, study session) are used and no synonym replaces them.
6 Metadata keys, section headings, IDs and statuses are in English Pass Metadata keys, headings, IDs and statuses are English.
7 No translated twin (<name>.<language>.md) exists beside the document Pass No translated twin exists beside the document (checked in docs/).
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again Pass First version; no change of language or domain since an earlier accepted version.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass The reviewer is the stand-in for S01, the Product Owner, who reads English and knows the IT domain; no second language reviewer is needed (review-checklist-process step 2). Open to challenge by S01 in the end-of-run summary.
10 Abbreviations are spelled out on first use, in the stated language Fail CSV, MVVM, UI, PO and similar abbreviations are not all spelled out at first use; Optional, deferred.

Overall Verdict

Go — every Mandatory criterion passes; the failed Optional criteria are deferred with an action item. Reviewed by AI as stand-in for S01; not independent of the author.

Action Items

Action Owner Due
Criterion LANG 10 (Optional) failed: Abbreviations are spelled out on first use, in the stated language; fix or accept the deferral S01 2026-10-21