Stakeholder Analysis: Flash Card

Metadata

Key Value
ID SA-001
CrossReference BC-001
Language en
Domain it

Version History

Date Status Author Reviewer Change Commit
2026-10-14 Accepted Jens Tirsvad Nielsen AI as stand-in for S01 Initial version c3fbcbc

Purpose

This analysis names the people who influence the flash card project or are affected by it, so that owners, reviewers and readers can be cited by a stable ID in every other document. It follows the power and interest grid: each stakeholder is placed in one quadrant, and the quadrant sets how closely the project engages that stakeholder.

Stakeholder Summary Table

ID Name Role/Title Organization Power Level Interest Level Quadrant Primary Concern (Business Language)
S01 Jens Tirsvad Nielsen, course participant Product Owner, developer and reviewer Self (Tirsvad) HIGH HIGH Manage Closely Finish the assignment with a working, understood and documented solution
S02 Udemy coursists Fellow participants of the 100 Days of Code course Udemy course community LOW HIGH Keep Informed Readable, runnable code that keeps the assignment's function names, and instructions to run it, so that solutions can be shared and compared
S03 GitHub viewers Visitors who browse the repository for ideas Public LOW LOW Monitor A clear repository description, topics and README, and no runtime dependencies to install

Power/Interest Classification Rationale

  • Manage Closely (S01): S01 decides scope, writes the code and accepts the result, so both power and interest are high. S01 is the only stakeholder who can accept or reject a milestone.
  • Keep Informed (S02): S02 cannot change the project, so power is low. They share code and compare solutions, so interest is high; the project informs them through a README that explains how to run the program and tests, and through function names they recognise from the assignment.
  • Monitor (S03): S03 arrive occasionally and have no stake beyond finding the repository useful, so power and interest are both low. The project serves them with a repository description, topics and a README, and does not require them to install runtime dependencies.

S02 and S03 are classified by S01 as Product Owner; neither can be interviewed, so the classification is an assumption recorded in BC-001.

Primary Concerns and FURPS+ Mapping

ID Concern FURPS+ attribute
S01 The four assignment steps work and progress is saved Functionality
S01 Work is tracked step by step, each step reviewed Supportability (+ Process)
S01 Malay words are spoken, in Danish translation Functionality
S02 Code is readable and runnable with the assignment's function names Usability, Supportability
S02 Instructions to run the program and its tests Usability
S03 Repository description, topics and README are clear Usability
S03 No runtime dependencies to install Supportability (+ Implementation)

Communication Requirements

ID Channel Frequency Deliverable Phase / Milestone
S01 Chat session and pull request review Once per milestone Pull request with the milestone's changes and review record MIL-001 to MIL-007
S02 README and wiki Once, at the documentation milestone, then on change Run and test instructions, assignment function names MIL-007
S03 Repository description, topics, README and wiki Once, at the documentation milestone Description, topics, README, screenshots MIL-007

Conflicting Interests and Mitigations

Conflict Stakeholders Mitigation
S01 wants spoken Malay words (needs gTTS and playsound), S03 wants no runtime dependencies S01, S03 Speech is an optional extra (pip install .[speech]) behind a port; the core program uses the standard library only
S01 wants clean architecture with layers, S02 wants code that is simple to read and compare with the assignment S01, S02 The assignment's function names (next_card, flip_card, is_known) are kept at the presentation layer, and the wiki maps each assignment step to the files that implement it

Traceability Analysis

Business Goal Alignment

Stakeholder Concern Business Case objective
S01 Four assignment steps work, progress is saved Objective 1 of BC-001
S01 Spoken Malay word, Danish translation Objective 2 of BC-001
S01 Step-by-step tracking Objective 5 of BC-001
S02 Readable, runnable code with assignment function names Objectives 1 and 4 of BC-001
S03 Description, topics, README, no runtime dependencies Objectives 3 and 4 of BC-001

Sign-Off

Proposed by the author. Accepted when RC-* for SA-001 has the verdict Go; in autonomous mode by the AI as stand-in for S01, and open to challenge by S01 in the end-of-run summary.