Commit Graph
26 Commits
Author SHA1 Message Date
Tirsvad 7c1f1b6423 MIL-012: version 0.2.0, CHANGELOG and links
Version 0.2.0 in pyproject.toml, flash_card.__version__ and the Doxyfile
with a test that keeps the three equal; CHANGELOG entry for 0.2.0; README
and the wiki Install pages link the release pages. The upload limit probe
refused a 1 MB file (413), so the executable is not attached. Review
record RC-071 (Go).

Task: MIL-012#2
Task: MIL-012#3
Task: MIL-012#4
Task: MIL-012#8
2026-10-15 09:39:16 +08:00
Tirsvad 08c11b2108 Resolve pending commit links of the MIL-012 plan 2026-10-15 09:35:54 +08:00
Tirsvad 0264b6084f MIL-012 plan and documents: release v0.2.0
Milestone MIL-012; BC-001, US-001 (US-001.08 names the latest release)
and PP-001 updated. Review records RC-067 to RC-070, all Go (autonomous
mode, not independent).

Task: MIL-012#1
2026-10-15 09:35:52 +08:00
Tirsvad ce4aacb4bc MIL-011: Menu bar
Review record RC-066 (Go, autonomous mode, not independent).

Task: MIL-011#1
Task: MIL-011#2
Task: MIL-011#3
Task: MIL-011#4
Task: MIL-011#5
Task: MIL-011#6
Task: MIL-011#7
Task: MIL-011#8
2026-10-15 09:06:47 +08:00
Tirsvad 9693ed6c79 Resolve pending commit links of the MIL-011 plan 2026-10-15 08:52:17 +08:00
Tirsvad 2211d0f4cb MIL-011 plan and design: menu bar
Milestone MIL-011 with stories US-001.09 to US-001.12, and the documents
updated for the menu bar: BC-001, PP-001, US-001, UC-001, SSD-001, OC-001,
SD-001, DCD-001, DICT-001 and the wireframe. Review records RC-056 to
RC-065, all Go (autonomous mode, not independent).

Task: MIL-011#1
2026-10-15 08:52:13 +08:00
Tirsvad db87a6d33b MIL-010: release v0.1.0 results, the executable is not attached
The tag v0.1.0 and the release exist and the executable was rebuilt and
smoke-tested from the tagged commit, but the server's reverse proxy rejects
the upload (413). README, CHANGELOG and the wiki Install pages now say that
the executable is built from source until the limit is raised. Review
record RC-055 (Go-with-conditions).

Task: MIL-010#2
Task: MIL-010#3
Task: MIL-010#4
Task: MIL-010#6
2026-10-15 08:43:12 +08:00
Tirsvad aae09befcd Resolve pending commit links of the MIL-010 plan 2026-10-15 08:37:40 +08:00
Tirsvad 9c8e294021 MIL-010 plan and documents: release v0.1.0
Milestone MIL-010, story US-001.08, BC-001 and PP-001 amended (the release
of the executable is in scope), CHANGELOG.md for 0.1.0, and links to the
release page in README and the Install page of the wiki. Review records
RC-051 to RC-054, all Go (autonomous mode, not independent).

Task: MIL-010#1
Task: MIL-010#2
2026-10-15 08:37:38 +08:00
Tirsvad f311e71bde Resolve pending commit links of the MIL-009 amendment 2026-10-15 00:43:15 +08:00
Tirsvad 061b4f48b5 MIL-009: add task 9, fix a flaky unit test (plan and review)
Task row 9 added to MIL-009 after the merge; review records RC-049
(the fix) and RC-050 (MIL-009 re-review), both Go.
2026-10-15 00:43:13 +08:00
Tirsvad bc513810ec MIL-009: Executable with PyInstaller
Review record RC-048 (Go, autonomous mode, not independent).

Task: MIL-009#1
Task: MIL-009#2
Task: MIL-009#3
Task: MIL-009#4
Task: MIL-009#5
Task: MIL-009#6
Task: MIL-009#7
Task: MIL-009#8
2026-10-15 00:32:14 +08:00
Tirsvad d37f165c19 Resolve pending commit links of the MIL-009 plan 2026-10-15 00:17:31 +08:00
Tirsvad 768ca344c9 MIL-009 plan and documents: executable with PyInstaller
Milestone MIL-009, story US-001.07, ADR-0004, and the amended BC-001,
DCD-001 and PP-001. Review records RC-042 to RC-047, all Go (autonomous
mode, not independent).

Task: MIL-009#1
2026-10-15 00:17:27 +08:00
Tirsvad f45d6036e4 MIL-008: Choose level
Review record RC-041 (Go, autonomous mode, not independent).

Task: MIL-008#1
Task: MIL-008#2
Task: MIL-008#3
Task: MIL-008#4
Task: MIL-008#5
Task: MIL-008#6
Task: MIL-008#7
Task: MIL-008#8
2026-10-14 23:58:31 +08:00
Tirsvad f4d8267da1 Resolve pending commit links of the MIL-008 plan 2026-10-14 23:45:04 +08:00
Tirsvad 0b983b7fda MIL-008 plan and design: choose level (100, 1000 or all words)
New milestone MIL-008 with story US-001.06, and the design documents
updated for the level choice: BC-001, PP-001, US-001, UC-001, DM-001,
DICT-001, SSD-001, OC-001, SD-001, DCD-001 and the wireframe. Review
records RC-030 to RC-040, all Go (autonomous mode, not independent).

Task: MIL-008#1
2026-10-14 23:44:59 +08:00
Tirsvad 92894268c5 MIL-007: Documentation and publication
Review record RC-029 (Go, autonomous mode, not independent).

Task: MIL-007#1
Task: MIL-007#2
Task: MIL-007#3
Task: MIL-007#4
Task: MIL-007#5
Task: MIL-007#6
Task: MIL-007#7
Task: MIL-007#8
2026-10-14 22:42:26 +08:00
Tirsvad b3c5116110 MIL-006: Spoken Malay word
Review record RC-028 (Go, autonomous mode, not independent).

Task: MIL-006#1
Task: MIL-006#2
Task: MIL-006#3
Task: MIL-006#4
Task: MIL-006#5
2026-10-14 22:39:36 +08:00
Tirsvad 8dbaaa3059 MIL-005: Step 4 - Save progress
Review record RC-027 (Go, autonomous mode, not independent).

Task: MIL-005#1
Task: MIL-005#2
Task: MIL-005#3
Task: MIL-005#4
Task: MIL-005#5
2026-10-14 22:29:58 +08:00
Tirsvad 02e0c2c55e MIL-004: Step 3 - Flip the cards
Review record RC-026 (Go, autonomous mode, not independent).

Task: MIL-004#1
Task: MIL-004#2
Task: MIL-004#3
2026-10-14 22:05:48 +08:00
Tirsvad 8d66c43eea MIL-003: Step 2 - New flash cards
Review record RC-025 (Go, autonomous mode, not independent).

Task: MIL-003#1
Task: MIL-003#2
Task: MIL-003#3
Task: MIL-003#4
Task: MIL-003#5
2026-10-14 21:59:29 +08:00
Tirsvad 019565635d MIL-002: Step 1 - User interface
Review record RC-024 (Go, autonomous mode, not independent).

Task: MIL-002#1
Task: MIL-002#2
Task: MIL-002#3
Task: MIL-002#4
2026-10-14 21:53:07 +08:00
Tirsvad cc24b7d890 MIL-001: project foundation
pyproject.toml (Python >=3.13, no runtime dependencies, speech and dev extras),
Python .gitignore, layer skeleton with constants.py, Doxyfile, README with the
.venv instructions, the Malay to Danish word list and review record RC-023.

Task: MIL-001#1
Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#5
Task: MIL-001#6
2026-10-14 21:39:14 +08:00
Tirsvad 5e1a8c1f6f Resolve pending commit links of the baseline documents 2026-10-14 21:33:40 +08:00
Tirsvad c3fbcbcfaf Add the plan baseline: business case, stakeholders, plan, design and milestones
Business Case, Stakeholder Analysis, Project Plan, use case chain
(UCD, US, UC, DM, SSD, OC, SD, DCD, DICT), three ADRs, milestones
MIL-001 to MIL-007, the traceability matrix and 22 review records
(autonomous mode, AI as stand-in for S01).
2026-10-14 21:33:25 +08:00