Add the plan baseline: business case, stakeholders, plan, design and milestones
Business Case, Stakeholder Analysis, Project Plan, use case chain (UCD, US, UC, DM, SSD, OC, SD, DCD, DICT), three ADRs, milestones MIL-001 to MIL-007, the traceability matrix and 22 review records (autonomous mode, AI as stand-in for S01).
This commit is contained in:
@@ -0,0 +1,51 @@
|
||||
# RC-010: Review of SD-001
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-010 |
|
||||
| CrossReference | [SD-001], [QC-SD-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-14 | Accepted | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | pending |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [SD-001]
|
||||
- Checklist used: [QC-SD-001]
|
||||
- Scope: full review
|
||||
- Language and domain: n/a (technical type)
|
||||
- Language reviewer: none
|
||||
- Mode: autonomous, not independent (reviewer is `AI as stand-in for S01`)
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | Message passing strictly follows UML sync/async/return arrow syntax | Pass | Calls are solid arrows with dashed returns. |
|
||||
| 2 | GRASP/GoF patterns applied and explicitly annotated where used (e.g. Controller, Observer, Mediator, Factory) | Pass | Each sequence has a Pattern Annotations table (Creator, Information Expert, Null Object, MVVM, Repository). |
|
||||
| 3 | Lifelines show activation bars matching actual processing time/call nesting | Pass | Activations are drawn for the session and the view model. |
|
||||
| 4 | Object creation and destruction shown with correct UML notation (`create`/`destroy` messages, X on lifeline) | Pass | `create` is used for `Deck` and `StudySession`; no object is destroyed during the program's life and that is stated by omission, the process ends. |
|
||||
| 5 | Diagram realizes the postconditions of a specific Operation Contract | Pass | Each sequence has a Postcondition Coverage table for its contract in OC-001. |
|
||||
| 6 | Responsibility assignment favors low coupling/high cohesion (no god-object receiving all messages) | Pass | Responsibility Check notes state that no object receives all messages. |
|
||||
| 7 | Loop, alt, and opt combined fragments used correctly for conditional/repeated behavior | Pass | `alt` and `opt` fragments are used for the progress file and the empty deck. |
|
||||
| 8 | Each exception of the realized Operation Contract is shown as an `alt` or `opt` fragment, or its absence is justified | Fail | The exceptions of OC-001 (missing file, malformed file) are raised before the sequence starts and are not drawn as `alt` fragments; Optional, deferred. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — every Mandatory criterion passes; the failed Optional criteria are deferred with an action item. Reviewed by AI as stand-in for S01; not independent of the author.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| Criterion 8 (Optional) failed: Each exception of the realized Operation Contract is shown as an `alt` or `opt` fragment, ; fix or accept the deferral | S01 | 2026-10-21 |
|
||||
|
||||
---
|
||||
|
||||
[SD-001]: ../../../docs/uc-001/sd.md
|
||||
[QC-SD-001]: ../../../framework/qc/artifacts/qc-sequence-diagram.md
|
||||
Reference in New Issue
Block a user