MIL-009: add task 9, fix a flaky unit test (plan and review)

Task row 9 added to MIL-009 after the merge; review records RC-049
(the fix) and RC-050 (MIL-009 re-review), both Go.
This commit is contained in:
2026-10-15 00:43:13 +08:00
parent 7bf6d5804b
commit 061b4f48b5
5 changed files with 141 additions and 4 deletions
+67
View File
@@ -0,0 +1,67 @@
# RC-050: Review of MIL-009
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-050 |
| CrossReference | [MIL-009], [QC-MIL-001], [QC-LANG-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-15 | Accepted | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [MIL-009]
- Checklist used: [QC-MIL-001], and [QC-LANG-001] (language and domain)
- Scope: full review
- Language and domain: en / it
- Language reviewer: none (the stand-in for S01 reads the language and knows the domain)
- Mode: autonomous, not independent (reviewer is `AI as stand-in for S01`)
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | A concrete Deliverable section names the output evaluated at the gate. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | The Go / No-Go table has numbered criteria, each with an observable Go and No-Go. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table names the milestone or documents it needs. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability table maps to Business Case objectives and the user story. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership table names S01 as owner and approving reviewer. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target Date lies inside the 2026-10-14 to 2026-10-21 window of the Business Case. |
## Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | Metadata of MIL-009 has `Language | en` and `Domain | it`; neither is a placeholder. |
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | `en` is a BCP 47 code and `it` is a value of the registry's domain list. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | Prose and table cells are English; Malay and Danish words and file names appear only as quoted data. |
| 4 | The register matches the one the registry gives for the artifact type | Pass | The registry gives `IT Executive English` for this type; the text is written for that reader. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | The PO terms of DICT-001 (flash card, word list, words to learn, study session) are used and no synonym replaces them. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Metadata keys, headings, IDs and statuses are English. |
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | No translated twin exists beside the document (checked in `docs/`). |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | First version; no change of language or domain since an earlier accepted version. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | The reviewer is the stand-in for S01, the Product Owner, who reads English and knows the IT domain; no second language reviewer is needed (review-checklist-process step 2). Open to challenge by S01 in the end-of-run summary. |
| 10 | Abbreviations are spelled out on first use, in the stated language | Fail | CSV, MVVM, UI, PO and similar abbreviations are not all spelled out at first use; Optional, deferred. |
## Overall Verdict
Go — every Mandatory criterion passes; the failed Optional criteria are deferred with an action item. Reviewed by AI as stand-in for S01; not independent of the author.
Re-review of MIL-009 after task 9 was added (a flaky unit test fix); Go/No-Go criteria, deliverable and dates are unchanged.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Criterion LANG 10 (Optional) failed: Abbreviations are spelled out on first use, in the stated language; fix or accept the deferral | S01 | 2026-10-21 |
---
[MIL-009]: ../../../docs/milestones/mil-009-executable.md
[QC-MIL-001]: ../../../framework/qc/artifacts/qc-milestones-gateways.md
[QC-LANG-001]: ../../../framework/qc/artifacts/qc-language-domain.md