Files
025-weather/docs/sqa/reviews/rc-001-business-case.md
T
2026-10-13 15:20:46 +08:00

5.4 KiB

RC-001: Review of BC-001

Metadata

Key Value
ID RC-001
CrossReference BC-001, QC-BC-001, QC-LANG-001, DICT-001

Version History

Date Status Author Reviewer Change Commit
2026-10-13 Proposed Jens Tirsvad Nielsen AI as stand-in for S01 Initial version 165e91a

Artifact Under Review

  • Instance reviewed: BC-001
  • Checklist used: QC-BC-001 and, for the language and domain, QC-LANG-001
  • Scope: full review
  • Language and domain: en / it
  • Language reviewer: none (the reviewer reads English and knows the IT domain)
  • Mode: autonomous, not independent (the reviewer is AI as stand-in for S01; the assistant also drafted the document)

Checklist Results

# Criterion Status Evidence/Notes
1 ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified Pass The Cost-Benefit section states that the assessment is qualitative on purpose (unpaid learning project, one participant), which is the explicit justification.
2 Risks are identified with documented impact and mitigation Pass The Risks table has 9 risks, each with an impact and a mitigation.
3 Success criteria are measurable, stating explicit targets rather than vague aspirations Pass 13 success criteria, each with a target and a measure (values such as [12, 14, 15, 14, 21, 22, 24], 17.428..., 24, 53.6; exit codes; 0 warnings).
4 Scope explicitly separates In Scope vs Out of Scope Pass ### In Scope and ### Out of Scope are separate sections.
5 Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline Pass The Stakeholders table cites S01, S02 and S03 of [SA-001] and describes only their interest in the project.
6 Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) Pass The Methodological and Standards Foundation names the SQA/QC framework, ISO/IEC 25010:2023, PEP 8, 257 and 484, and the dictionary.
7 Assumptions and constraints are explicit and clearly distinguished from one another Pass Assumptions and Constraints are separate sections.
8 Document supports executive decision-making with a clear, unambiguous recommendation Pass The Recommendation reads Proceed with a one-sentence rationale.

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Language is en and Domain is it in Metadata.
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is a BCP 47 code; it is in the registry's domain list.
3 The content (prose and table cells) is written in the stated language Pass All prose and table cells of BC-001 are English.
4 The register matches the one the registry gives for the artifact type Pass The register is the one the registry gives for the type; code names appear in backticks only where a check needs them.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass Terms are those of DICT-001 (CSV file, row, column, table, temperature, average, select, export); no synonym row exists.
6 Metadata keys, section headings, IDs and statuses are in English Pass Metadata keys, headings, IDs and statuses are English.
7 No translated twin (<name>.<language>.md) exists beside the document Pass docs/ holds one file per artifact; there is no <name>.<language>.md.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again N-A First version of the document: there is no earlier accepted version.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass The assistant, as stand-in for S01, reads English and knows the IT domain and checked the terms against DICT-001.
10 Abbreviations are spelled out on first use, in the stated language Pass Abbreviations (CSV, SQA, QC, PEP, CI, API, PyPI, FURPS+, RACI, ISO/IEC) are spelled out or defined on first use, or are standard names.

Overall Verdict

Go — all Mandatory criteria pass or are not applicable. The rows above were assessed on 2026-10-13 by the assistant that drafted the document, as stand-in for S01 in autonomous mode (chosen by S01 in chat on 2026-10-13). Mode: autonomous, not independent. This review is not independent: the drafter and the reviewer are the same assistant, and author and approver (S01) are one person in a single-participant project. S01 accepted the plan in chat on 2026-10-13; the verdict can be challenged in the run summary or on the pull request.

Action Items

Action Owner Due
Challenge this Go in the run summary or on the pull request if the stand-in decision is not wanted S01 2026-10-15