# SQA Review Record ## Metadata | Key | Value | | --- | --- | | ID | RC-013 | | CrossReference | [QC-MIL-001], [QC-LANG-001] | ## Version History | Date | Status | Author | Reviewer | Change | Commit | | --- | --- | --- | --- | --- | --- | | 2026-10-13 | Proposed | Claude (AI) for S01 | AI as stand-in for S01 | Initial review record: Go | [172778d] | --- ## Artifact Under Review - Instance reviewed: [MIL-003] - Checklist used: [QC-MIL-001], [QC-LANG-001] - Scope: full review (re-review after task 7 was added; earlier record RC-005) - Language and domain: en / it - Language reviewer: none - Mode: autonomous, not independent (the reviewer is `AI as stand-in for S01`; the author is the same AI) ## Checklist Results ### QC-MIL-001 | # | Criterion | Status | Evidence/Notes | | --- | --- | --- | --- | | 1 | A concrete deliverable is defined for every gate (Mandatory) | Pass | Deliverable unchanged: runnable game on the tested core. | | 2 | Explicit Go/No-Go criteria are stated for each gate (Mandatory) | Pass | Six objectively checkable criteria, unchanged. | | 3 | Dependencies on other milestones are explicitly mapped (Optional) | Pass | Depends on MIL-002 with a reason. | | 4 | Each milestone is traceable to a Business Case objective or KPI (Mandatory) | Pass | Traceable to BC-001 objectives 1, 2 and success criterion 1. | | 5 | Milestone owner and approving reviewer are identified (Mandatory) | Pass | Owner S01, approving reviewer S01 (stand-in). | | 6 | Milestone has a defined target date consistent with project constraints (Mandatory) | Pass | 2026-10-13, within the duration constraint. | ### QC-LANG-001 | # | Criterion | Status | Evidence/Notes | | --- | --- | --- | --- | | 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder (Mandatory) | Pass | Language en, Domain it. | | 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list (Mandatory) | Pass | BCP 47 code en; domain it is in the registry list. | | 3 | The content (prose and table cells) is written in the stated language (Mandatory) | Pass | Content is English. | | 4 | The register matches the one the registry gives for the artifact type (Mandatory) | Pass | IT Executive English register for MIL. | | 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms (Mandatory) | Pass | No DICT exists; standard software terms; stand-in decision. | | 6 | Metadata keys, section headings, IDs and statuses are in English (Mandatory) | Pass | Structural vocabulary English. | | 7 | No translated twin (`..md`) exists beside the document (Mandatory) | Pass | No translated twin. | | 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again (Mandatory) | Pass | No language change; the task row addition is recorded in Version History. | | 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly (Mandatory) | Pass | Reviewer, AI as stand-in for S01, reads English and the software domain; open to challenge. | | 10 | Abbreviations are spelled out on first use, in the stated language (Optional) | Pass | Abbreviations spelled out on first use in the milestone documents. | ## Overall Verdict Go - MIL-003 with task 7 added meets every Mandatory criterion. Full re-review; the added task is a defect fix inside the accepted scope, with no change to the gate criteria. ## Action Items | Action | Owner | Due | | --- | --- | --- | | None | S01 | | --- [QC-MIL-001]: ../../../framework/qc/artifacts/qc-milestones-gateways.md [QC-LANG-001]: ../../../framework/qc/artifacts/qc-language-domain.md [MIL-003]: ../../milestones/mil-003-turtle-game.md [172778d]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/025-us-states-game/commit/172778d22b7d78fe91eb91b145055289c87ac208