Commit Graph
7 Commits
Author SHA1 Message Date
Tirsvad cf5c488f20 Resolve pending commit links
CI / checks (push) Successful in 48s
CI / checks (pull_request) Successful in 46s
Replaces pending in the Version History of the Project Plan with a link to the commit that introduced the row.
2026-10-08 19:05:29 +08:00
Tirsvad 012b83987c Close the GitHub copy open issue in the Project Plan
The GitHub copy of the repository already shows the same description and topics as the Gitea repository. This project did not set them; in the day-20 repository a workflow on the git host does, so no task is added. The Version History gets a row, accepted by S01 in chat.
2026-10-08 19:05:27 +08:00
Tirsvad efd0c7fc00 Resolve pending commit links
CI / checks (push) Successful in 47s
CI / checks (pull_request) Successful in 44s
Replaces pending in the Version History of RC-008 with a link to the commit that introduced the row.
2026-10-08 18:31:25 +08:00
Tirsvad 0d3b91321d Record the review of the MIL-002 code (RC-008)
Python code reviewed against QC-PY-001 with the verdict Go. Task 7 stays open: the manual play of criterion 5 is S01's.

Task: MIL-002#7
Refs #14
2026-10-08 18:31:08 +08:00
Tirsvad 5568141bf7 Resolve pending commit links
CI / checks (push) Successful in 48s
CI / checks (pull_request) Successful in 41s
Replaces pending in the Version History of the documents with links to the commits that introduced the rows.
2026-10-08 17:47:11 +08:00
Tirsvad d87029a2e7 Record the review of the MIL-001 code (RC-007)
Python code reviewed against QC-PY-001 with the verdict Go. The repository description and topics (task 7) have no file in the repository; they were set on the git host on 2026-10-08.

Task: MIL-001#7
Closes #7
2026-10-08 17:46:57 +08:00
Tirsvad f13d004447 Plan the Day 21 repository: business case, stakeholders, plan and milestones
Adds the Business Case, Stakeholder Analysis, Domain Dictionary, Project Plan and milestones MIL-001 to MIL-003, with the review records RC-001 to RC-006 (all Go). The repository starts from the finished main of 020-snake-game, as S01 decided on 2026-10-08. The milestones and their 22 issues were synced to the git host.
2026-10-08 17:46:38 +08:00