Commit Graph
8 Commits
Author SHA1 Message Date
Tirsvad 575df4d07f Resolve pending commit links
CI / checks (pull_request) Successful in 59s
Replace pending in the Version History of the project plan with the link to the
commit that accepted the new version.
2026-10-08 00:26:05 +08:00
Tirsvad c893fc1a17 Update the project plan Reviews wording after the code reviews
The Reviews open issue now records the code reviews of the four milestones against
QC-PY-001 (RC-014 to RC-017, all Go). S01, the Product Owner, accepted the new
version on 2026-10-08, so the Version History gets a new Accepted row and the
previous one becomes Deprecated.
2026-10-08 00:26:04 +08:00
Tirsvad eb73bb33e4 Resolve pending commit links
CI / checks (pull_request) Successful in 1m4s
Replace pending in the Version History of the traceability matrix and of the four
code review records with the link to the commit that added them.
2026-10-08 00:22:58 +08:00
Tirsvad 4d7cc33cac Record the code reviews of the four milestones against QC-PY-001
RC-014 to RC-017 review the Python code each milestone added or changed and all
four end in Go. S01 accepted the imports inside create_window and create_pen as a
documented exception, the name tim, N-A for criterion 10 (the project has no
design class diagram) and the lower-bounded development tools. The traceability
matrix lists the code of each milestone.

Closes #8
Closes #15
Closes #22
Closes #29
2026-10-08 00:22:56 +08:00
Tirsvad 795b9dba39 Resolve pending commit links
CI / checks (pull_request) Successful in 1m1s
Replace pending in the Version History of the project plan with the link to the
commit that accepted it.
2026-10-08 00:12:24 +08:00
Tirsvad 16183ccff6 Accept the project plan and link the synced milestones
S01, the Product Owner, accepted PP-001 on 2026-10-08: the Version History gets
a new Accepted row and the Reviews open issue says so. The Gateway Schedule now
links the four milestones that were created on the Gitea host (issues #1 to #29).
2026-10-08 00:12:23 +08:00
Tirsvad 1526262910 Resolve pending commit links
Replace pending in the Version History of the documents with the link to
the commit that added them.
2026-10-07 23:58:35 +08:00
Tirsvad 4b3391b226 Add the business case, stakeholder analysis, plan, milestones, dictionary and reviews
Business case BC-001, stakeholder analysis SA-001, project plan PP-001, the four
milestones MIL-001 to MIL-004, the domain dictionary DICT-001, the review records
RC-001 to RC-013 and the traceability matrix.

The reviews end in Go: the business case, stakeholder analysis, dictionary and the
four milestones are Accepted. The project plan is still Proposed; it has no
checklist and is accepted directly by the Product Owner.
2026-10-07 23:58:31 +08:00