RC-014 to RC-017 review the Python code each milestone added or changed and all
four end in Go. S01 accepted the imports inside create_window and create_pen as a
documented exception, the name tim, N-A for criterion 10 (the project has no
design class diagram) and the lower-bounded development tools. The traceability
matrix lists the code of each milestone.
Closes#8Closes#15Closes#22Closes#29
Business case BC-001, stakeholder analysis SA-001, project plan PP-001, the four
milestones MIL-001 to MIL-004, the domain dictionary DICT-001, the review records
RC-001 to RC-013 and the traceability matrix.
The reviews end in Go: the business case, stakeholder analysis, dictionary and the
four milestones are Accepted. The project plan is still Proposed; it has no
checklist and is accepted directly by the Product Owner.