Commit Graph
18 Commits
Author SHA1 Message Date
Tirsvad 0fe106d2f0 Resolve pending commit links
CI / checks (push) Successful in 44s
CI / checks (pull_request) Successful in 48s
Replace pending in the Version History of RC-019 and of the traceability matrix with
the link to the commit that recorded the verdict.
2026-10-08 01:28:07 +08:00
Tirsvad 6dac0d6762 Record the verdict Go on RC-019
S01 accepted the assistant's runs as the measure for success criteria 1 and 5 and
recorded Go on the re-check of the Business Case success criteria on main. All seven
criteria are met, and the conditions of RC-018 are closed. The traceability matrix
row follows the verdict.

Refs #28
2026-10-08 01:28:05 +08:00
Tirsvad cca1499de5 Resolve pending commit links
CI / checks (push) Successful in 46s
CI / checks (pull_request) Successful in 44s
Replace pending in the Version History of RC-019 with the link to the commit that
added it.
2026-10-08 01:22:27 +08:00
Tirsvad 03700b8de2 Record the re-check of the Business Case success criteria on main
RC-019 repeats the check of RC-018 against main (7d2c9e3), using a fresh clone from
the README's own GitHub URL, the README steps under PowerShell, the real command,
the host's CI runs, settings and pull requests. All seven criteria are met. It
closes the conditions of RC-018 on criterion 5 and on how main reaches GitHub;
S01's own run of the five commands (criterion 1) is the one left. The proposed
verdict is Go and S01 decides.

Refs #28
2026-10-08 01:22:25 +08:00
Tirsvad 45c0cf8acf Resolve pending commit links
CI / checks (pull_request) Successful in 1m2s
Replace pending in the Version History of RC-018 and of the traceability matrix with
the link to the commit that recorded the verdict.
2026-10-08 00:41:16 +08:00
Tirsvad 54f60a951a Record the verdict Go-with-conditions on RC-018
S01 decided the check of the Business Case success criteria on 2026-10-08. Six of the
seven criteria are met; criterion 5 is not met until the code is on main and on
GitHub, so the first three action items of RC-018 are the conditions. The
traceability matrix row follows the verdict.

Refs #28
2026-10-08 00:41:15 +08:00
Tirsvad 4cb75dff77 Resolve pending commit links
CI / checks (pull_request) Successful in 1m3s
Replace pending in the Version History of the traceability matrix with the link to
the commit that added the RC-018 row.
2026-10-08 00:39:11 +08:00
Tirsvad 88aee4051d Add RC-018 to the traceability matrix
A new row for the check of the success criteria of BC-001 against the delivered
repository, for the gate of MIL-004. Its record RC-018 is a draft with the verdict
Pending, so the row says draft, no verdict.

Refs #28
2026-10-08 00:39:10 +08:00
Tirsvad 665301689d Resolve pending commit links
CI / checks (pull_request) Successful in 1m2s
Replace pending in the Version History of RC-018 with the link to the commit that
added it.
2026-10-08 00:37:08 +08:00
Tirsvad 76ac50e591 Record the verification of the Business Case success criteria
RC-018 checks the seven success criteria of BC-001 against the delivered repository
with a fresh clone, the README steps under PowerShell, the real command, the host's
CI runs and settings, and the pull requests. Criteria 1 to 4, 6 and 7 are met.
Criterion 5 is not met as written yet: the README clones the GitHub repository,
which holds only the initial commit until the pull requests are merged. The proposed
verdict is Go-with-conditions and S01 decides.

Refs #28
2026-10-08 00:37:07 +08:00
Tirsvad 575df4d07f Resolve pending commit links
CI / checks (pull_request) Successful in 59s
Replace pending in the Version History of the project plan with the link to the
commit that accepted the new version.
2026-10-08 00:26:05 +08:00
Tirsvad c893fc1a17 Update the project plan Reviews wording after the code reviews
The Reviews open issue now records the code reviews of the four milestones against
QC-PY-001 (RC-014 to RC-017, all Go). S01, the Product Owner, accepted the new
version on 2026-10-08, so the Version History gets a new Accepted row and the
previous one becomes Deprecated.
2026-10-08 00:26:04 +08:00
Tirsvad eb73bb33e4 Resolve pending commit links
CI / checks (pull_request) Successful in 1m4s
Replace pending in the Version History of the traceability matrix and of the four
code review records with the link to the commit that added them.
2026-10-08 00:22:58 +08:00
Tirsvad 4d7cc33cac Record the code reviews of the four milestones against QC-PY-001
RC-014 to RC-017 review the Python code each milestone added or changed and all
four end in Go. S01 accepted the imports inside create_window and create_pen as a
documented exception, the name tim, N-A for criterion 10 (the project has no
design class diagram) and the lower-bounded development tools. The traceability
matrix lists the code of each milestone.

Closes #8
Closes #15
Closes #22
Closes #29
2026-10-08 00:22:56 +08:00
Tirsvad 795b9dba39 Resolve pending commit links
CI / checks (pull_request) Successful in 1m1s
Replace pending in the Version History of the project plan with the link to the
commit that accepted it.
2026-10-08 00:12:24 +08:00
Tirsvad 16183ccff6 Accept the project plan and link the synced milestones
S01, the Product Owner, accepted PP-001 on 2026-10-08: the Version History gets
a new Accepted row and the Reviews open issue says so. The Gateway Schedule now
links the four milestones that were created on the Gitea host (issues #1 to #29).
2026-10-08 00:12:23 +08:00
Tirsvad 1526262910 Resolve pending commit links
Replace pending in the Version History of the documents with the link to
the commit that added them.
2026-10-07 23:58:35 +08:00
Tirsvad 4b3391b226 Add the business case, stakeholder analysis, plan, milestones, dictionary and reviews
Business case BC-001, stakeholder analysis SA-001, project plan PP-001, the four
milestones MIL-001 to MIL-004, the domain dictionary DICT-001, the review records
RC-001 to RC-013 and the traceability matrix.

The reviews end in Go: the business case, stakeholder analysis, dictionary and the
four milestones are Accepted. The project plan is still Proposed; it has no
checklist and is accepted directly by the Product Owner.
2026-10-07 23:58:31 +08:00