Add the SQA and QC framework and project instructions

Mount the framework as a submodule at framework/ (v0.4.0), add AGENTS.md and
the installed skill copies for Codex CLI (.agents/skills) and Claude Code
(.claude/skills).
This commit is contained in:
2026-10-07 23:49:15 +08:00
parent 0d3f30355a
commit 7c0ed0dcc5
117 changed files with 5706 additions and 0 deletions
+18
View File
@@ -0,0 +1,18 @@
# Traceability Matrix (TM)
One matrix per project: `docs/sqa/traceability-matrix.md`. It makes the
Business Case's cross-artifact traceability target measurable.
## Required sections (after Metadata / Version History)
- **Purpose**.
- **Traceability Table** — one row per artifact instance:
`Artifact Instance | Type | Language | Domain | Upstream (Backward Link) |
Downstream (Forward Link) | Last Reviewed (RC-ID)`. `Language` and `Domain`
copy the artifact's Metadata rows so a reviewer can pick the right reviewer
from the matrix; they are `-` for a technical type (OC, SD, DCD, ERD, ADR,
TM, RC, QC, source code). `check-languages.sh --list` prints the same values.
Add or update a row whenever an instance is created or reviewed.
- **Coverage Notes** — which types have no instance yet, and how to read
`-`: in Upstream it means foundational; in Downstream it means nothing
is built on it yet; in Last Reviewed it means no `RC-*` exists yet.