016-pretty-table/.agents/skills/artifact/references/BC.md
T
Tirsvad b0a7414204 Add Pretty Table project: plan, accepted documents and code
Business Case, Stakeholder Analysis, Project Plan and milestone MIL-001
with review records RC-001 to RC-003, then the Python project: PrettyTable
Pokemon table, constants, pytest tests, pyproject.toml, Doxyfile, CI
workflow and README.

Task: MIL-001#1
Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#5
Task: MIL-001#6
Task: MIL-001#7
Task: MIL-001#8
2026-10-07 12:02:59 +08:00

2.3 KiB
Raw Blame History

Business Case (BC)

Cite in CrossReference only if the instance exists (new-artifact.sh checks this for you):

  • SA — Stakeholders section — cite S-IDs instead of re-describing roles
  • BMC — Cost–Benefit Assessment must agree with its cost/revenue blocks
  • BPMN — Forward: the process that realizes the objectives
  • KPI — Success Criteria — each criterion is operationalized by a KPI
  • UCD — Forward: scope expressed as actors and goals

Required sections (after Metadata / Version History)

In this order:

  1. Executive Summary — one paragraph framing the problem and the proposed solution.
  2. Methodological and Standards Foundation — states the methodology (e.g. Larman's Applying UML and Patterns) and quality standards (e.g. ISO/IEC 25002/25010/25019) the rest of the document and downstream artifacts are built on.
  3. Problem Statement — the recurring problems that justify the project.
  4. Business Opportunity — what becomes possible if the problem is solved.
  5. Objectives — concrete, verifiable statements of what the project will achieve.
  6. Scope — split into ## In Scope and ## Out of Scope subsections.
  7. Expected Benefits — split into ### Tangible Benefits and ### Intangible Benefits.
  8. Strategic Alignment — how the project supports organizational goals.
  9. Success Criteria — a table with explicit, measurable targets (not aspirations).
  10. Risks — a table with Risk | Impact | Mitigation columns; every risk must have a mitigation.
  11. Assumptions — bullet list, kept distinct from Constraints.
  12. Constraints — bullet list, kept distinct from Assumptions.
  13. Cost–Benefit Assessment — a table (Costs | Benefits); may be qualitative if explicitly justified.
  14. Stakeholders — a table referencing exact stakeholder IDs from the project's Stakeholder Analysis (e.g. S01, S07) if SA exists per the CrossReference check above. Never re-describe stakeholder roles inline instead of citing their IDs — this is the single most common defect found when reviewing Business Cases (see QC-BC-001's Common Defects).
  15. Recommendation — a single, unambiguous "proceed" or "do not proceed" statement.