Traceability Matrix
Metadata
| Key |
Value |
| ID |
TM-001 |
| CrossReference |
BC-001 |
Version History
| Date |
Status |
Author |
Reviewer |
Change |
Commit |
| 2026-10-06 |
Proposed |
Jens Tirsvad Nielsen |
S01 |
Added MIL-004 |
8ef00aa |
| 2026-10-06 |
Proposed |
Jens Tirsvad Nielsen |
S01 |
Added RC-006, RC-007 and the source code row |
00d47e2 |
Purpose
Tracks backward/forward links between artifact instances so that the Business Case's
cross-artifact traceability can be measured. A row is added or updated whenever an
artifact instance is created or reviewed.
Traceability Table
| Artifact Instance |
Type |
Upstream (Backward Link) |
Downstream (Forward Link) |
Last Reviewed (RC-ID) |
| SA-001 |
Stakeholder Analysis |
- |
BC-001 |
RC-002 |
| BC-001 |
Business Case |
SA-001 |
PP-001, MIL-001, MIL-002, MIL-003, MIL-004 |
RC-001 |
| PP-001 |
Project Plan |
BC-001, SA-001 |
MIL-001, MIL-002, MIL-003, MIL-004 |
- |
| MIL-001 |
Milestone |
BC-001, PP-001 |
- |
RC-003 |
| MIL-002 |
Milestone |
BC-001, PP-001 |
- |
RC-004 |
| MIL-003 |
Milestone |
BC-001, PP-001 |
- |
RC-005 |
| MIL-004 |
Milestone |
BC-001, PP-001 |
- |
RC-007 |
Source code (src/, tests/) |
Source code |
MIL-002, MIL-003, MIL-004 |
- |
RC-006 |
Coverage Notes
- in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no RC-* exists yet.
- PP-001 has no QC checklist in the framework, so it has no
RC-*.
- No use case, domain model, design or data artifacts exist; the plan treats all tasks as plain technical tasks. The source code is reviewed in RC-006.