RC-005 MIL-003 Review

Metadata

Key Value
ID RC-005
CrossReference MIL-003, QC-MIL-001

Version History

Date Status Author Reviewer Change Commit
2026-10-06 Proposed Jens Tirsvad Nielsen S01 Initial version 8ef00aa

Artifact Under Review

  • Instance reviewed: MIL-003 (docs/milestones/mil-003-quality-and-publication.md)
  • Checklist used: QC-MIL-001 (QC-MIL-001)
  • Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.

Checklist Results

# Criterion Status Evidence/Notes
1 A concrete deliverable is defined for every gate Pass Deliverable section names the concrete output.
2 Explicit Go/No-Go criteria are stated for each gate Pass Go/No-Go table with one checkable criterion per row.
3 Dependencies on other milestones are explicitly mapped Pass Dependencies table present.
4 Each milestone is traceable to a Business Case objective or KPI Pass Traceability cites the Business Case objectives.
5 Milestone owner and approving reviewer are identified Pass Ownership names S01 as owner and approving reviewer (same person; see independence note).
6 Milestone has a defined target date consistent with project constraints Pass Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail.

Overall Verdict

Go — all criteria pass. Delivery matches: issues #13 to #17 closed, PR 22 merged.

Action Items

Action Owner Due
None S01 -