Every document the framework works with is an artifact with a short name. The short name is the start of the document's ID (BC-001, UC-003) and of its QC checklist (QC-BC-001). This page says what each short name is and what it is for. The complete list, with locations and what each requires, is the artifact catalog.

Planning and governance

Short name Artifact Description Purpose
SA Stakeholder Analysis The people and groups the project affects, with their concerns, influence and role. Each gets an ID (S01, S02, ...). Say who the project is for and who decides. Owners, reviewers and the RACI cite these IDs, never invented role names.
BC Business Case The problem, the objectives, the scope, the constraints and the recommendation. It also holds the risk analysis (Risks table) and the cost-benefit assessment. Justify the project and set the goals every later artifact traces back to. Nothing else is written before it.
GOV Governance Who governs what: the review team (a team, not one person), the RACI per artifact category, the review workflow, escalation and cadence. Make it clear who may review, approve and sign off, so a review is never one person marking their own work.
PP Project Plan The phases, the order of the milestones, the schedule and the resources. Turn the Business Case into a plan the milestones and their tasks follow.
ADR Architecture Decision Record One decision per file: context, options, decision and consequences. Numbered ADR-0001. Keep the reason for a technical choice, so nobody has to guess later why it was made.
RC SQA Review Record The outcome of one review of one artifact: the checklist used, the findings and a Go or No-Go. Numbered in sequence. Show that an artifact meets our standard, and who checked it.
QC Quality Criteria Our checklists, one per artifact type (QC-BC-001), each criterion tagged with an ISO/IEC 25010 characteristic. Define what "good enough" means for each type, so a review is a check against a list and not an opinion.

Requirements and design

Each step uses the one before it: the use case drives the domain model, the system sequence diagram, the operation contract, the sequence diagram, the design class diagram and the ERD.

Short name Artifact Description Purpose
US User Story One need in the form "As a role, I want ..., so that ...", with acceptance criteria. Say what a user wants and why, in a size the team can plan.
UCD Use Case Diagram A picture of the actors and the use cases of the system. Show the scope of the system at a glance.
UC Use Case One goal of an actor as a scenario: brief, casual or fully dressed, with the main flow and the alternatives. Describe how the system is used, step by step, and drive the design.
DM Domain Model The concepts of the business, their attributes and relations, in the Product Owner's words. Give the team the same picture of the domain before any design.
SSD System Sequence Diagram The system as a black box: the events an actor sends and the responses, for one use case. Find the system operations a use case needs.
OC Operation Contract For one system operation: preconditions and postconditions, in IT terms. State exactly what an operation changes, so it can be built and tested.
SD Sequence Diagram The objects that collaborate to carry out an operation, message by message. Assign responsibilities to classes.
DCD Design Class Diagram The classes of the software with attributes, operations and relations. The blueprint the code follows.
ERD Entity Relationship Diagram The tables, columns, keys and relations of the database. The blueprint of the stored data.
Wireframe Wireframe A sketch of a screen. It has no short name and no ID of its own: it is kept with the use case it illustrates. Agree the screens before the user interface is built.

Security and operations

Short name Artifact Description Purpose
SBL Security Baseline The project's profile and one decision for each of the controls B01 to B18, with every opt-out justified, owned and approved. Make the security effort deliberate and owned.
THM Threat Model The assets, trust boundaries, threats and mitigations, each traced to the design and to a test. Design and test against stated threats, not guesses.
OPS Operations Plan Monitoring, patching, backup and restore, rollback, incidents, vulnerability handling and decommissioning. Run the system safely after release.

Diagrams

The diagrams of the artifacts are PlantUML text.

Rendering. render-diagrams.sh renders them on a PlantUML server and fails on a syntax error. The server is a setting of your organisation, because the diagram text is sent to it; the framework names none. The script takes the server from, in this order: --server <url>, the environment variable PLANTUML_URL, and the PlantUML server row of the Tools section of docs/artifact-registry.md.

Layers in the SD and the DCD. With a layered architecture (Clean, Hexagonal, Onion or similar) the Sequence Diagram groups the lifelines by layer and the Design Class Diagram has one package per layer, with dependencies pointing inward. Each layer has the same pastel colour in every project, so a reader knows a layer by its colour:

Layer Colour Also named
Delivery #FADADD (pink) Presentation, UI, API, Interface Adapters
Application #FFF3B0 (yellow) Use Cases, Services
Domain #CDEFD3 (green) Entities, Core, Model
Infrastructure #D4E4F7 (blue) Frameworks and Drivers, Persistence, External

Arrows in the UCD. A Use Case Diagram is laid out with the fewest arrow crossings: try the order of the actors and the use cases, the sides and the direction, render each, and keep the layout with the fewest crossings. When arrows still cross, each actor whose arrows cross gets a strong colour of its own, for the actor and all of its arrows: #D62728 (red), #1F77B4 (blue), #E67E22 (orange), #8E44AD (purple), #00897B (teal), in that order.

Also in the catalog

Short name Artifact Purpose
KPI KPI Definitions Measure the success criteria of the Business Case
RA Risk Analysis Rank the assumptions and test the riskiest; detail beyond the Business Case's Risks table
BMC, BPMN Business Model Canvas, BPMN Process Model Describe the business model and the business process
MIL Milestone / Gateway A gate with a deliverable, Go/No-Go criteria and the tasks that become issues
DICT Domain Dictionary Map each Product Owner term to its IT term
AD Architecture Description Index the architecture views and decisions (only when asked for)
TP Test Plan Plan and cover the testing
TM Traceability Matrix Show that every artifact traces to another and to its review
PRC, CSG, TRN, TRR Review process, coding standards governance, reviewer training and its record Support the governance
PY, CL, CPP, CS, RS, FL, RX, SH, YML, WF Source code, scripts and CI workflows Types that are reviewed against a code checklist; no template