Review Record: MIL-012 results of tasks 1, 6 and the review fixes (MIL-012)
Metadata
| Key | Value |
|---|---|
| ID | RC-082 |
| CrossReference | MIL-012, QC-MIL-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-19 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version; accepted by the author in chat as stand-in for S01 | 3325bea |
Artifact Under Review
- Instance reviewed: MIL-012
- Checklist used: QC-MIL-001
- Scope: delta re-review of the milestone after RC-080: the new
## Verification resultssection (task 1, task 6, the fixes made after the review of pull request 194), the added[ADR-0011]in the CrossReference, and the claims about open tasks. Criteria 1 to 6 are re-read; none of the milestone's own text for them changed. ADR-0011 is not reviewed here: it staysProposedand needs a review against its own checklist - Language and domain: n/a (technical type)
- Mode: supervised, not independent (the author, Jens Tirsvad Nielsen, asked in chat on 2026-10-19 for the acceptance and stands in for S01; the AI prepared the evidence)
Checklist Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | A concrete deliverable is defined for every gate | Pass | Unchanged: release 2.2.0 with the two actions, guides, wiki pages in three languages, ADR, framework templates pinned. The results section does not claim any of it is delivered; it lists tasks 2 to 5, 7, 8 and 10 to 12 as open. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Unchanged, ten criteria. The results bear on two of them. Criterion 1 (a uses: of a subfolder action resolves, the form recorded): runs 417 and 418 show both forms resolve at @main, and the failure at the deleted branch is explained by the log text "reference not found". Criterion 6 (scripts linted in CI, a seeded error fails): met by tools/lint-action-scripts.sh and its tests on the working branch; the pull-request run of the new step is the final evidence. The other eight criteria are not claimed. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Unchanged; ADR-0011 is added to the CrossReference and exists. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Unchanged: objective O6 and success criterion 6 of BC-001, reviewed in RC-081. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Unchanged: owner S05, approving reviewer S01. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Unchanged: 2026-11-06. The open tasks 2 to 5 need the operator's runner (S03); the milestone states the dependency, and the date is at risk until the runner exists. |
Results check
| # | Claim in the results | Status | Evidence/Notes |
|---|---|---|---|
| 1 | Task 1: both forms resolve at @main |
Pass | Run 418 (.../actions/runs/2425): jobs wg-short, wg-full, ts-short, ts-full each executed the action's mask step and main step and failed with the action's own [configuration] error. Read from the job logs through the API. |
| 2 | Run 417 failed because the branch was deleted | Pass | git ls-remote showed no wireguard-vpn-action head after pull request 194 merged; the log says Unable to resolve wireguard-vpn-action: reference not found. |
| 3 | Task 6: lint script, workflow step, pinned tools, seeded-error test | Pass | tools/lint-action-scripts.sh; the test file seeds a shellcheck problem and a badly formatted script, shows both fail, and shows the two action scripts pass; the full suite (590 tests) passes locally. Not yet run by the instance's CI. |
| 4 | The ten findings of the review of pull request 194 are answered | Pass | Each has a code change and an offline test (the daemon wait with a delayed stub, sudo that resets the environment, a host daemon not taken over, a line break refused, the key file removed on failure, latest refused). The wording of the results says they are offline-tested with stubs and that tasks 3 and 4 must show them on a runner. |
| 5 | Open tasks are listed honestly | Pass | Tasks 2, 3, 4, 5, 7, 8, 10, 11 and 12 are named as open, with the reason. |
Overall Verdict
Go - the results recorded are accurate and claim no more than the evidence shows. The author confirmed the acceptance in chat on 2026-10-19 as stand-in for S01; this is not an independent review.
Action Items
| Action | Owner | Due |
|---|---|---|
Review ADR-0011 against its checklist and accept or change it; it is Proposed |
S01 | Before task 10 (release 2.2.0) |
Provide the vpn runner, the WireGuard peer and the Tailscale tag with an OAuth client for tasks 3 and 4; the target date 2026-11-06 depends on it |
S03 | 2026-10-30 |
| Confirm this record by S01 when an independent reading is possible | S01 | 2026-11-02 |