Tirsvad 044d8ba21f Define the release process and version pinning
Add the brief use case UC-006 (Release a Reusable Workflow), the use case in
UCD-001, stories US-001.11 to US-001.13 and ADR-0006: one version for the
repository with SemVer tags and a moving major tag, a release only from a
green commit with a changelog entry, consumers pin the major or an exact tag
and never main. Add the maintainers' checklist guides/release-process.md.
Review and accept them (RC-040 to RC-043), update TM-001 and the registry.

Task: MIL-004#1
2026-10-10 22:46:23 +08:00

2.9 KiB

Release process

For the maintainers of this repository: how a change to the shared workflows is validated, versioned and announced, and how consumers pin a version. The decisions are in ADR-0006; this guide is the checklist. It is not published on the wiki.

Until the release workflow exists (MIL-004 task 5) the steps are done by hand.

What a version is

Item Rule
Unit The whole repository: the workflows, their scripts and the guides
Version tag vMAJOR.MINOR.PATCH, for example v1.2.0; never deleted or moved
Major tag vMAJOR, for example v1; points to the latest compatible release
First release v1.0.0
Breaking (new major) A renamed or removed workflow, input, secret name or output; a raised default tool version or a changed default that can turn a green consumer red; a changed meaning of pass or fail
Minor A new optional input, workflow or capability; nothing changes for existing callers
Patch A fix, or documentation and tests, with no visible change for consumers

Checklist for a release

  1. Decide the version from the table above, looking at every merged change since the last tag.
  2. Check the commit. The validation run (validate-workflows) on the exact commit of main to be released is green; do not release from a red or unchecked commit.
  3. Write the changelog entry in CHANGELOG.md: the version, the date, and the changes in the groups Breaking, Added, Changed and Fixed. A change that touches credentials, tokens or permissions says so.
  4. Get the approval of S01 for the release, in the pull request that adds the changelog entry.
  5. Tag. Create vMAJOR.MINOR.PATCH on the approved commit, then move vMAJOR to it:
    git tag -a v1.2.0 -m "v1.2.0" <commit>
    git push origin v1.2.0
    git tag -f v1 <commit> && git push -f origin v1
    
  6. Announce. Create the release page for the tag with the changelog entry as its text, and say whether consumers must act.
  7. Verify. One repository pinned to the previous exact tag still runs the same code; one repository on the major tag receives the release.

How consumers pin

Pin Receives Use when
@v1.2.0 nothing new, ever a pipeline must not change
@v1 compatible releases only the default for a project
@main everything, unreleased never; only this repository's own tests

Reusable workflows are pinned in the uses: line of the caller. The scoped workflows (sync and publish wiki) are delivered from main by the instance and cannot be pinned by a consumer; they fetch their scripts at the major tag once v1 exists.

Undoing a faulty release

  1. Move the major tag back to the previous exact tag: git tag -f v1 v1.1.0 && git push -f origin v1.
  2. Fix forward on main and release a patch version.
  3. Do not delete or move an exact tag; consumers may have pinned it.