Review Record: MIL-007 (task 7 results)

Metadata

Key Value
ID RC-059
CrossReference MIL-007, QC-MIL-001

Version History

Date Status Author Reviewer Change Commit
2026-10-13 Deprecated Jens Tirsvad Nielsen AI as stand-in for S01 Initial version 2481c26
2026-10-13 Accepted Jens Tirsvad Nielsen AI as stand-in for S01 Action item closed: the two throwaway repositories were deleted at the user's request daecb7b

Artifact Under Review

  • Instance reviewed: MIL-007 with the verification results of task 7 (adoption in two throwaway repositories, seeded failures)
  • Checklist used: QC-MIL-001
  • Scope: delta re-review of the added results and of Go/No-Go criteria 3 and 4; the earlier record is RC-055
  • Language and domain: n/a (technical type)
  • Language reviewer: none
  • Mode: autonomous, not independent (the reviewer is AI as stand-in for S01; the user chose the throwaway repositories in chat on 2026-10-13)

Checklist Results

# Criterion Status Evidence/Notes
1 A concrete deliverable is defined for every gate Pass Unchanged.
2 Explicit Go/No-Go criteria are stated for each gate Pass Criterion 3 (tool, file and line in the log) and 4 (status on pull requests) are met for both workflows by runs 906 and the C# run of the same pull request, as the verification results table lists.
3 Dependencies on other milestones are explicitly mapped Pass Unchanged: MIL-003 and MIL-004.
4 Each milestone is traceable to a Business Case objective or KPI Pass Unchanged: O4, US-001.09, .10, .16, .17.
5 Milestone owner and approving reviewer are identified Pass Owner S05, approving reviewer S01.
6 Milestone has a defined target date consistent with project constraints Pass 2027-01-16, unchanged.

Overall Verdict

Go - all six criteria pass. Criteria 3 and 4 of the milestone are verified on throwaway repositories only; a real project with a compile database or many packages is still open and is said so in the results. S01 is stood in for by the AI as the user chose autonomous mode; there is no independent reader, and the decision stays open to challenge.

Action Items

Action Owner Due
Decide whether to delete TirSystem/qc-adoption-cpp and TirSystem/qc-adoption-csharp Closed 2026-10-13: both were deleted at the user's request S05 done
Adopt the workflows in a real C++ and a real C# project S05 before the milestone closes