Add the brief use case UC-006 (Release a Reusable Workflow), the use case in UCD-001, stories US-001.11 to US-001.13 and ADR-0006: one version for the repository with SemVer tags and a moving major tag, a release only from a green commit with a changelog entry, consumers pin the major or an exact tag and never main. Add the maintainers' checklist guides/release-process.md. Review and accept them (RC-040 to RC-043), update TM-001 and the registry. Task: MIL-004#1
8.8 KiB
8.8 KiB
Traceability Matrix
Metadata
| Key | Value |
|---|---|
| ID | TM-001 |
| CrossReference | BC-001, SA-001, PP-001, MIL-001, MIL-002, MIL-003, MIL-004, MIL-005, MIL-006, RC-001, RC-002, RC-003, RC-004, RC-005, RC-006, RC-007, RC-008, RC-009, RC-010, RC-011, RC-012, RC-013, RC-014, RC-015, RC-016, RC-017, RC-018, RC-019, RC-020, RC-021, RC-022, RC-023, RC-024, RC-025, RC-026, RC-027, RC-028, RC-029, RC-030, RC-031, RC-032, RC-033, RC-034, RC-035, RC-036, RC-037, RC-038, RC-039, RC-040, RC-041, RC-042, RC-043, UC-006, ADR-0006, UC-005, ADR-0005, UCD-001, US-001, UC-001, UC-002, UC-003, UC-004, ADR-0001, ADR-0002, ADR-0003, ADR-0004 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-10 | Deprecated | Jens Tirsvad Nielsen | S01 | Added RC-039 for MIL-003 | 3b8681d |
| 2026-10-10 | Accepted | Jens Tirsvad Nielsen | S01 | Added UC-006, ADR-0006 and RC-040 to RC-043 | pending |
Purpose
Tracks backward/forward links between artifact instances so that the Business Case's cross-artifact traceability success criterion is measurable. A row is added or updated whenever an artifact instance is created or reviewed.
Traceability Table
Coverage Notes
-in Upstream means foundational (SA-001 has no prerequisite). In Downstream it means nothing is built on the instance yet. In Last Reviewed it means noRC-*exists (review records are not themselves reviewed).- Types with no instance yet: KPI, BMC, BPMN, SSD, DM, OC, SD, DCD, ERD, GOV, DICT. The four P1 use case candidates are written as brief use cases (UC-001 to UC-004); the P2 and P3 candidates have no use case document yet.
- PP-001 and TM-001 have no QC checklist; RC-002 validated PP-001 against its Business Case constraints and the milestone Go / No-Go criteria. TM-001 has no review record.
- All review records are
Acceptedafter S01 stood in for S05 on 2026-10-10. The author and S01 are the same person, so an independent review by S05 is still open (see RC-001).