Tirsvad 6933e91c83 Pin the scoped workflows to v1 and record the MIL-004 results
Task: MIL-004#1
2026-10-11 03:03:42 +08:00
Tirsvad 9c357f79ca Resolve pending commit links in MIL-004, RC-034 and TM-001
Validate workflows / validate (pull_request) Successful in 17s
2026-10-10 13:41:37 +08:00
Tirsvad 616c5d2e48 Plan task 6 of MIL-004: move the embedded scripts to files
The sync and publish-wiki scoped workflows embed 200 to 300 lines of Python
in their YAML. Add task 6 to move them to tools/ and run them from a
checkout of this repository, as verified from two organisations, with a
Go/No-Go criterion and O2 in the traceability. Review and accept the
amendment (RC-034) and update TM-001.
2026-10-10 13:41:36 +08:00
Tirsvad e2c6bedb26 Resolve pending commit links in the milestones, PP-001, review records and TM-001
Validate workflows / validate (pull_request) Successful in 16s
2026-10-10 13:23:44 +08:00
Tirsvad ea06eaaa69 Approve the token permissions and confirm the target dates
S01, standing in for S05 (ADR-0002), approves the minimum Gitea and GitHub
token permissions, recorded with the evidence from the Gitea source and the
GitHub documentation; they are still not tested with a minimal token on the
instance. Confirm the target dates of MIL-001 to MIL-006 and PP-001 (RC-026
to RC-032), update TM-001 and regenerate the Credentials wiki page with its
translations.

Task: MIL-002#4
2026-10-10 13:23:40 +08:00
TirsvadandClaude Sonnet 5.5 16b9060d4c Mark MIL-002, MIL-003 and MIL-004 as Accepted
Set the owner/reviewer revision of each milestone to Accepted and deprecate
its initial row, as the Product Owner accepted the milestones. No task
content changed.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 21:19:58 +08:00
TirsvadandClaude Sonnet 5.5 72d2671978 Resolve pending commit links in document version histories
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 20:28:49 +08:00
TirsvadandClaude Sonnet 5.5 4de5438a88 Add project plan, milestones and SQA framework; document actual capabilities
Adopt the SQA/QC framework as a submodule and plan the project before any
further code: Business Case, Stakeholder Analysis (S01-S05), Project Plan with
use case candidates and prioritisation, and milestones MIL-001..MIL-004
(24 tasks, synced to Gitea as milestones 18-21 and issues #1-#24).

README now separates implemented from planned capabilities, has an English
sequence diagram and points at the scoped workflow. The workflow file moves
out of the repository root and out of .gitea/workflows/; the scoped copy is
unchanged in behaviour here and still contains the known `exit 0` syntax
error, which MIL-001 fixes.

Refs #1
Refs #2
Refs #3
Refs #6

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 20:28:44 +08:00