Commit Graph
5 Commits
Author SHA1 Message Date
TirsvadandClaude Sonnet 5.5 16b9060d4c Mark MIL-002, MIL-003 and MIL-004 as Accepted
Set the owner/reviewer revision of each milestone to Accepted and deprecate
its initial row, as the Product Owner accepted the milestones. No task
content changed.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 21:19:58 +08:00
TirsvadandClaude Sonnet 5.5 2228c49f29 Resolve pending commit link in MIL-001 version history
Validate workflows / validate (pull_request) Successful in 16s
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 20:46:02 +08:00
TirsvadandClaude Sonnet 5.5 cbb9688ed4 Stabilise the metadata sync workflow and add offline validation
Restructure the script embedded in the scoped sync workflow into testable
functions, fix the invalid `exit 0` (now a successful run with a visible
warning when Gitea returns an invalid push mirror list) and report errors as
`ERROR: <message>` with exit code 1. Zero, several or malformed GitHub mirrors
still fail.

Add pytest-based offline tests (workflow YAML, embedded Python, credential and
mirror parsing, sync flow against a fake API) that run in a virtual
environment, and a validation workflow that runs them on pull requests and
pushes to main. Remove the manual tests/test_.ps1 probe and the duplicate
src/ copy of the workflow. Update the README and record the decisions for
tasks 1 and 3 in MIL-001.

Task: MIL-001#1
Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#5
Task: MIL-001#6
Refs #1
Refs #2
Refs #3
Refs #4
Refs #5
Refs #6

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 20:45:57 +08:00
TirsvadandClaude Sonnet 5.5 72d2671978 Resolve pending commit links in document version histories
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 20:28:49 +08:00
TirsvadandClaude Sonnet 5.5 4de5438a88 Add project plan, milestones and SQA framework; document actual capabilities
Adopt the SQA/QC framework as a submodule and plan the project before any
further code: Business Case, Stakeholder Analysis (S01-S05), Project Plan with
use case candidates and prioritisation, and milestones MIL-001..MIL-004
(24 tasks, synced to Gitea as milestones 18-21 and issues #1-#24).

README now separates implemented from planned capabilities, has an English
sequence diagram and points at the scoped workflow. The workflow file moves
out of the repository root and out of .gitea/workflows/; the scoped copy is
unchanged in behaviour here and still contains the known `exit 0` syntax
error, which MIL-001 fixes.

Refs #1
Refs #2
Refs #3
Refs #6

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-03 20:28:44 +08:00