SQA Review Record: Release 0.3.4

Metadata

Key Value
ID RC-034
CrossReference MIL-011, QC-MIL-001, MIL-010, BC-001, US-001, PP-001

Version History

Date Status Author Reviewer Change Commit
2026-10-13 Accepted Jens Tirsvad Nielsen S02 Initial version: draft for S02's decision 5f42d66

Artifact Under Review

  • Instance reviewed: MIL-011, and the changes it causes in US-001, PP-001 and TM-001.
  • Why: the last release is v0.3.3 (2026-10-09), main is 24 commits ahead and VERSION still says 0.3.3. MIL-010 added no version bump, so the accepted TOKEN_FOR_GITEA_WIKI key and the wiki in three languages are in no release. The phase bumps the version to 0.3.4, writes the changelog entry and releases v0.3.4 with the Release workflow, whose real run stays S01's decision.
  • Checklist used: QC-MIL-001 for MIL-011. The other artifacts were changed, not created; their change is checked below.
  • Review date: 2026-10-13

Checklist Results (QC-MIL-001)

# Criterion Status Evidence/Notes
1 A concrete deliverable is defined for every gate Pass Version 0.3.4: VERSION and the --version check, a dated ## [0.3.4] changelog entry with [Unreleased] empty, the tag v0.3.4 and its release page, and the moving tag v0. What does not change (credentials asked, host requests, steps, framework pin) is stated.
2 Explicit Go/No-Go criteria are stated for each gate Pass Six criteria, each with an objective Go and No-Go: the version output, the changelog entry, the Quality run and no new test failure, the dry run of the Release workflow, the tag and release page, and the moving tag. Criterion 2 is "Reviewed by S02"; criteria 5 and 6 are "Verified on Gitea".
3 Dependencies on other milestones are explicitly mapped Pass MIL-010, whose key, wiki pages and guide the release ships and which must be merged first.
4 Each milestone is traceable to a Business Case objective or KPI Pass The Business Case (BC-001) as the script's release, and US-001. No objective is added or changed.
5 Milestone owner and approving reviewer are identified Pass Owner S01, approving reviewer S02.
6 Milestone has a defined target date consistent with project constraints Pass 2027-01-05, proposed in PP-001; the window 2027-01-04 (Monday) to 2027-01-05 (Tuesday) follows MIL-010, which ends Wednesday 2026-12-30. The Business Case sets no deadline.

Change checks on the other artifacts

Artifact Change Status Evidence/Notes
US-001 MIL-011 in the CrossReference Pass Link only; no story or acceptance criterion changes.
PP-001 Phase MIL-011, its window, the Gantt, the scope coverage, the dependency chain, "eleven phases" and the end date Pass Proposed dates 2027-01-04 to 2027-01-05.
TM-001 Row for MIL-011 and this record; Last Reviewed updated for each changed artifact Pass See the matrix.

Mechanical checks run for this review: every link definition of the changed files points at an existing file and none is unused; the Gantt dates fall on the weekdays named above; MIL-011 has 6 criteria and 2 tasks; sync-project.sh --milestone MIL-011 parses it (milestone 104, issues #90 and #91 created on Gitea); the version appears only in src/lib/constants.sh and tests/test-security.sh outside the changelog and the review records.

Not covered by this review: the version bump, the changelog entry and the release are the tasks of MIL-011 and are checked at its gate.

Consequences S02 accepts with a Go

  • The release ships everything on main since v0.3.3, including the wiki and documentation changes, not only the script change.
  • The real run of the Release workflow is not started by this record; S01 starts it when the dry run is read.

Overall Verdict

Go — every criterion of the checklist passes and the changed documents agree with each other. Drafted by Claude Code for S02; the author and reviewer are the same person for now, as in RC-033. S02 accepted MIL-011 in chat on 2026-10-13 and asked for this record; the Version History rows of MIL-011 and the changed documents were set to Accepted and the rows before them to Deprecated.

Action Items

Action Owner Due
None - -