Plan MIL-011: release 0.3.4
Adds the milestone MIL-011 with its review RC-034 (Go), the phase in the project plan, MIL-011 in the CrossReference of the user stories, and the rows of the traceability matrix. The milestone and its two issues, #90 and #91, are on Gitea.
This commit is contained in:
+11
-7
@@ -4,23 +4,23 @@
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | PP-001 |
|
||||
| CrossReference | [BC-001], [SA-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004], [MIL-005], [MIL-006], [MIL-007], [MIL-008], [MIL-009], [MIL-010], [US-001] |
|
||||
| CrossReference | [BC-001], [SA-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004], [MIL-005], [MIL-006], [MIL-007], [MIL-008], [MIL-009], [MIL-010], [MIL-011], [US-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-08 | Deprecated | Jens Tirsvad Nielsen | S02 | Added phase MIL-009 (proposed dates 2026-12-21 to 2026-12-23): the framework files .claude, .agents and AGENTS.md are excluded from git | [08cb484] |
|
||||
| 2026-10-13 | Accepted | Jens Tirsvad Nielsen | S02 | Added phase MIL-010 (proposed dates 2026-12-28 to 2026-12-30): the wiki token is accepted in .env and the access-token guide moves to the wiki | [9cca295] |
|
||||
| 2026-10-13 | Deprecated | Jens Tirsvad Nielsen | S02 | Added phase MIL-010 (proposed dates 2026-12-28 to 2026-12-30): the wiki token is accepted in .env and the access-token guide moves to the wiki | [9cca295] |
|
||||
| 2026-10-13 | Accepted | Jens Tirsvad Nielsen | S02 | Added phase MIL-011 (proposed dates 2027-01-04 to 2027-01-05): release 0.3.4 | pending |
|
||||
|
||||
---
|
||||
|
||||
## Purpose
|
||||
|
||||
Schedule the ten phases that deliver RepoFoundry (`create-project.sh` and its documentation) in dependency order. The Business Case sets no deadline, so the dates below are proposals for S01 to confirm.
|
||||
Schedule the eleven phases that deliver RepoFoundry (`create-project.sh` and its documentation) in dependency order. The Business Case sets no deadline, so the dates below are proposals for S01 to confirm.
|
||||
|
||||
## Planning Assumptions
|
||||
|
||||
- Week 1 starts 2026-10-05; the plan ends by 2026-12-30 (the last five phases are proposed).
|
||||
- Week 1 starts 2026-10-05; the plan ends by 2027-01-05 (the last six phases are proposed).
|
||||
- Phase length: two weeks.
|
||||
- S01 and S02 review each phase through a pull request, as described in [SA-001]. For now one person holds both roles.
|
||||
- The PO language is English, so no translated copies are kept.
|
||||
@@ -39,6 +39,7 @@ Schedule the ten phases that deliver RepoFoundry (`create-project.sh` and its do
|
||||
| Gitea Is the Only Remote | [MIL-008] | 2026-12-14 to 2026-12-18 | 2026-12-18 | S01 | US-001.03 | The local project has `origin` only; GitHub is reached through the mirror | |
|
||||
| Framework Files Excluded from Git | [MIL-009] | 2026-12-21 to 2026-12-23 | 2026-12-23 | S01 | US-001.03 | `.claude`, `.agents` and `AGENTS.md` excluded from git in the new project | |
|
||||
| Wiki Token and Access-Token Guide | [MIL-010] | 2026-12-28 to 2026-12-30 | 2026-12-30 | S01 | US-001.05 | `TOKEN_FOR_GITEA_WIKI` accepted in `.env`; access-token guide in the wiki | |
|
||||
| Release 0.3.4 | [MIL-011] | 2027-01-04 to 2027-01-05 | 2027-01-05 | S01 | US-001 | Version 0.3.4 released on Gitea with its changelog entry | |
|
||||
|
||||
```plantuml
|
||||
@startgantt
|
||||
@@ -63,6 +64,8 @@ Project starts 2026-10-05
|
||||
[Framework Files Excluded from Git Go/No-Go] happens 2026-12-23
|
||||
[Wiki Token and Access-Token Guide] starts 2026-12-28 and ends 2026-12-30
|
||||
[Wiki Token and Access-Token Guide Go/No-Go] happens 2026-12-30
|
||||
[Release 0.3.4] starts 2027-01-04 and ends 2027-01-05
|
||||
[Release 0.3.4 Go/No-Go] happens 2027-01-05
|
||||
@endgantt
|
||||
```
|
||||
|
||||
@@ -84,11 +87,12 @@ Project starts 2026-10-05
|
||||
| The local project has `origin` as its only remote | [MIL-008] |
|
||||
| `.claude`, `.agents` and `AGENTS.md` excluded from git in the new project | [MIL-009] |
|
||||
| `TOKEN_FOR_GITEA_WIKI` accepted in `.env`; access-token guide in the wiki | [MIL-010] |
|
||||
| Version 0.3.4 released | [MIL-011] |
|
||||
|
||||
## Dependencies
|
||||
|
||||
```
|
||||
MIL-001 → MIL-002 → MIL-003 → MIL-004 → MIL-005 → MIL-006 → MIL-007 → MIL-008 → MIL-009 → MIL-010
|
||||
MIL-001 → MIL-002 → MIL-003 → MIL-004 → MIL-005 → MIL-006 → MIL-007 → MIL-008 → MIL-009 → MIL-010 → MIL-011
|
||||
```
|
||||
|
||||
A No-Go moves every later date by the time needed to rework the failed criteria.
|
||||
@@ -122,11 +126,11 @@ A No-Go moves every later date by the time needed to rework the failed criteria.
|
||||
[MIL-008]: ./milestones/mil-008-gitea-only-remote.md
|
||||
[MIL-009]: ./milestones/mil-009-exclude-framework-files.md
|
||||
[MIL-010]: ./milestones/mil-010-wiki-token-and-access-token-guide.md
|
||||
[MIL-011]: ./milestones/mil-011-release-0-3-4.md
|
||||
[US-001]: ./user-stories.md
|
||||
[UC-001]: ./uc-001/uc.md
|
||||
[SSD-001]: ./uc-001/ssd.md
|
||||
[Milestone 43]: https://git.tirsystem.com/TirSystem-BashScript/RepoFoundry/milestone/43
|
||||
[Milestone 44]: https://git.tirsystem.com/TirSystem-BashScript/RepoFoundry/milestone/44
|
||||
[Milestone 45]: https://git.tirsystem.com/TirSystem-BashScript/RepoFoundry/milestone/45
|
||||
[08cb484]: https://git.tirsystem.com/TirSystem-BashScript/RepoFoundry/commit/08cb484498bab3d9480decda9df89e9564438185
|
||||
[9cca295]: https://git.tirsystem.com/TirSystem-BashScript/repo-foundry/commit/9cca29579f032538902e9cfe929bb3c7768281ab
|
||||
|
||||
Reference in New Issue
Block a user