| 1 |
Input/output messages match the corresponding Use Case's main success scenario step-for-step |
Pass |
startFromWorkingFolder covers steps 3 to 5 and provideProjectDetails steps 5 and 6; steps 1 and 2 are the Maintainer's own and the diagram says so. |
| 2 |
Actor and System are treated strictly as black boxes (system shown as :System) |
Pass |
Only Maintainer and :System appear. |
| 3 |
Object creation/destruction of the System instance handled explicitly where relevant |
N-A |
The system is one script run. |
| 4 |
Return values are shown for operations that produce one, using dashed return arrows |
Pass |
Dashed returns for the prompts and the summary. |
| 5 |
Alternate/exceptional flows are represented separately (or explicitly out of scope noted) |
Pass |
Failure flows are named as out of scope (extensions 1a, 3a, 4a, 4b). Added during this review: the first draft did not say so. |
| 6 |
Message names are verb phrases consistent with the use case's system responsibilities |
Pass |
Both messages are verb phrases. |
| 7 |
Diagram references the specific Use Case (name and ID) it depicts |
Pass |
Names UC-002 in Source Use Case. |