SQA Review Record: BC-001

Metadata

Key Value
ID RC-010
CrossReference BC-001, QC-BC-001

Version History

Date Status Author Reviewer Change Commit
2026-10-05 Proposed Jens Tirsvad Nielsen S02 Initial version; re-checked after objective 7 was added 02875ae

Artifact Under Review

  • Instance reviewed: BC-001
  • Checklist used: QC-BC-001
  • Review date: 2026-10-05

Checklist Results

# Criterion Status Evidence/Notes
1 ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified Pass Qualitative, and now explicitly justified (internal tooling, no revenue, no baseline). Fixed during this review.
2 Risks are identified with documented impact and mitigation Pass Six risks, each with impact and mitigation.
3 Success criteria are measurable, stating explicit targets rather than vague aspirations Pass Seven criteria with targets and measures; criteria 2 and 3 were reworded during this review for the optional GitHub path.
4 Scope explicitly separates In Scope vs Out of Scope Pass In Scope and Out of Scope are separate subsections. Objective 7 (documentation) was added during the SA-001 review; it is covered by the README scope item and success criterion 7.
5 Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline Pass The Stakeholders table cites S01, S02 and S03 with their interest only. Roles that had been re-described inline were removed during this review.
6 Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) Pass The framework, ISO/IEC 25010:2023 and the shell coding conventions are stated.
7 Assumptions and constraints are explicit and clearly distinguished from one another Pass Assumptions and Constraints are separate lists.
8 Document supports executive decision-making with a clear, unambiguous recommendation Pass Recommendation: Proceed.

Overall Verdict

Go — All mandatory criteria pass after the three fixes noted. Author and reviewer are the same person for now (S01 and S02 are both held by the Maintainer), so the framework independence rule is not met; re-review when a second person takes S02.

Action Items

Action Owner Due
None - -