S02 gave the Go in chat on 2026-10-08 and waived the PlantUML render check (no PlantUML server is configured). Add the review record RC-032, set the latest Version History rows of MIL-009 and the changed documents to Accepted and the rows before them to Deprecated, and record the review in the traceability matrix.
7.6 KiB
SQA Review Record: Framework files excluded from git
Metadata
| Key | Value |
|---|---|
| ID | RC-032 |
| CrossReference | MIL-009, QC-MIL-001, MIL-003, MIL-005, BC-001, US-001, UC-001, OC-001, SD-001, DCD-001, DCD-002, DM-001, DM-002, DICT-001, PP-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-08 | Accepted | Jens Tirsvad Nielsen | S02 | Initial version: draft for S02's decision | pending |
Artifact Under Review
- Instance reviewed: MIL-009, and the changes it causes in BC-001, US-001, UC-001, OC-001, SD-001, DCD-001, DCD-002, DM-001, DM-002, DICT-001, PP-001 and TM-001.
- Why: a new project gets
.claudeand.agents(the framework's skills, made byinstall-skills.sh) andAGENTS.md(copied from a framework template). The request is that git excludes these three in the new project after the framework is installed. The phase adds that step, using the.git/info/excludemechanism that MIL-005 already uses for the project's.env. - Checklist used: QC-MIL-001 for MIL-009. The other artifacts were changed, not created; their change is checked below.
- Review date: 2026-10-08
Checklist Results (QC-MIL-001)
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | A concrete deliverable is defined for every gate | Pass | The script with a new "Git excludes" step that writes /.claude, /.agents and /AGENTS.md to .git/info/exclude, shown in the dry-run plan and the summary; the documents that agree with it; the README; the tests; version 0.3.2 and release v0.3.2. The cases that are not excluded (framework steps skipped, a tracked path, framework, .gitmodules, the registry) are stated. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Eleven criteria, each with an objective Go and No-Go: ignored and absent from git status, only .git/info/exclude written, a second run and a file without a final newline, a tracked path, framework steps skipped, paths that must stay visible, dry run and summary, the .env exclusion unchanged, the documents in agreement, the acceptance criteria of US-001.03, and the version. Criteria 9 and 10 are "Reviewed by S02" and "Verified", as in MIL-007 and MIL-008. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | MIL-003 (the framework, skills and templates steps install the files) and MIL-005 (the .git/info/exclude code is reused), each with its reason. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Objective 5 of BC-001, which this phase extends, and US-001.03. No success criterion fits, so none is cited. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner S01, approving reviewer S02. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | 2026-12-23, proposed in PP-001; the window 2026-12-21 (Monday) to 2026-12-23 (Wednesday) follows MIL-008, which ends Friday 2026-12-18. The Business Case sets no deadline. |
Change checks on the other artifacts
| Artifact | Change | Status | Evidence/Notes |
|---|---|---|---|
| BC-001 | Objective 5 and one in-scope item name the exclusion | Pass | The out-of-scope list (no first commit) is consistent: nothing is committed. |
| US-001 | US-001.03 acceptance criterion; MIL-009 in the CrossReference and the Traces row | Pass | One given/when/then. No new story: the behavior belongs to the local-project story, so the count of seven stories is unchanged. |
| UC-001 | Postcondition, step 9, extension 9f, and a rule for step 9 | Pass | The rule fixes the mechanism (.git/info/exclude, never .gitignore), the whole folders, the paths that stay visible, and a tracked path. |
| OC-001 | P15 and two exceptions | Pass | P15 is appended, so P1 to P14 and the references to them in SD-001, DCD-001 and DCD-002 still hold. |
| SD-001 | Self-message excludeFromGit(localProject) in install, return installResult (trackedPaths), coverage row P15 |
Pass | The pattern is the one already used for requestSync. Diagram not rendered (see action items). |
| DCD-001, DCD-002 | FrameworkInstaller.excludeFromGit, InstallResult.trackedPaths, the class table, the method traceability and the DTO sentence |
Pass | Names and signature match SD-001. Diagram not rendered (see action items). |
| DM-001, DM-002, DICT-001 | Definitions of Framework Setup and Template | Pass | No new concept or attribute, as for Credentials File ("ignored by git"). The use-case model, the project model and the dictionary say the same. |
| PP-001 | Phase MIL-009, its window, the Gantt, the scope coverage, the dependency chain, "nine phases" and the end date | Pass | Proposed dates 2026-12-21 to 2026-12-23. |
| TM-001 | Row for MIL-009 and this record; Last Reviewed updated for each changed artifact | Pass | See the matrix. |
Mechanical checks run for this review: every link definition of the changed files points at an existing file and none is unused; the Gantt dates fall on the weekdays named above; MIL-009 has 11 criteria and 5 tasks; sync-project.sh --milestone MIL-009 parses it (milestone 87, issues #65 to #69 created on Gitea); the new names (excludeFromGit, trackedPaths, P15) are the same in every document that uses them.
Not covered by this review: the code, the README and the tests (tasks 2 to 5 of MIL-009) do not exist yet. Criteria 1 to 8, 10 and 11 of MIL-009 are checked at its gate, not here; criterion 9 is checked then too.
Consequences S02 accepts with a Go
- The whole folders
.claudeand.agentsare excluded, as requested, not only theirskillsfolders. Anything else a project keeps there (settings, agents) is not tracked either. - The entries live in
.git/info/exclude, which belongs to the clone. A fresh clone has neither the entries nor the files. The skills can be made again withinstall-skills.sh;AGENTS.mdcannot, because it is a copy of a template that the project edits.
Overall Verdict
Go — every criterion of the checklist passes and the changed documents agree with each other. One check was not done: the PlantUML diagrams of SD-001, DCD-001 and DCD-002 were not rendered, because no PlantUML server is configured and the framework does not choose one. Drafted by Claude Code for S02; the author and reviewer are the same person for now, as in RC-031. S02 gave the Go in chat on 2026-10-08, accepted the consequences listed above, and waived the diagram check; the Version History rows of MIL-009 and the changed documents were set to Accepted and the rows before them to Deprecated.
Action Items
| Action | Owner | Due |
|---|---|---|
| None. The diagram check was waived by S02 in chat on 2026-10-08; the three diagrams stay unrendered, and a syntax error found later is fixed in the document concerned | - | - |