Commit Graph
5 Commits
Author SHA1 Message Date
Tirsvad be759e3832 Give the test tasks of MIL-006 and MIL-007 their own titles
The sync matches issues by title, so Test every case moved issue #39 of MIL-005.
2026-10-07 12:38:01 +08:00
Tirsvad 250df38d79 Resolve pending commit links for MIL-007, UC-002 and the license rule 2026-10-07 12:31:07 +08:00
Tirsvad 1cd27f77ed Plan MIL-007 and UC-002; AGPL-3.0 default only for a public GitHub project
- MIL-006: the AGPL-3.0 default needs GitHub and a public project
- MIL-007: fetch the framework's own submodules (qc); start through a command link; README usage
- UC-002 with SSD, DM, OC, SD and DCD; US-001.07 and US-002
- Reconcile the project DM, DCD, dictionary, use case diagram and traceability matrix
- Review records RC-022 to RC-028
2026-10-07 12:30:58 +08:00
TirsvadandClaude Sonnet 5.5 5b66eff809 Resolve pending commit links for the MIL-006 plan
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-06 13:43:39 +08:00
TirsvadandClaude Sonnet 5.5 d773fa91df Plan MIL-006: the project license set in config.env
Add objective 10 to the Business Case, US-001.06 and the use case, SSD, OC,
SD, DM-001, DM-002, dictionary, DCD-001 and DCD-002 changes: a license set
in config.env (PROJECT_LICENSE, a Gitea license key or none) applies with or
without GitHub; when absent AGPL-3.0 applies only when GitHub is chosen. It
is never asked, and a license the server does not offer stops the run
before anything is created.

Add milestone MIL-006 (8 Go/No-Go criteria, 4 tasks) and its phase in the
Project Plan. All new rows are Proposed.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-06 13:43:35 +08:00