Commit Graph
10 Commits
Author SHA1 Message Date
TirsvadandClaude Sonnet 5.5 2a6bb8e8af Plan MIL-004: project details preset in config.env
Add objective 8 to the Business Case, US-001.04, extensions 3a and 3b of
UC-001 and the matching SSD, OC, SD, DM-001 and DM-002 notes. Add the phase
to the Project Plan and the milestone MIL-004 with eight Go/No-Go criteria
and five tasks (issues #27 to #31). Review recorded in RC-018.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 21:44:10 +08:00
TirsvadandClaude Sonnet 5.5 f34affa071 Resolve pending commit links for RC-017 and MIL-002
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 21:43:01 +08:00
TirsvadandClaude Sonnet 5.5 613a288dea Fix the defects found by the live end-to-end run, add RC-017
- Close stdin for ssh, git, curl and the framework scripts, so a real ssh
  no longer swallows answers meant for later prompts.
- Count LICENSE and LICENSE + README.md (what Gitea creates) as content
  the script made, so a partly created repository can be reused.
- Document the observed token scopes (write:user for user-owned Gitea
  repositories) and the Gitea README.md in the README.
- Correct criterion 2 of MIL-002 (new Proposed version row).
- Record the run and the final security review as RC-017.
- Tests: stdin regression, initial_only reuse, other files count as
  content, example config needs its address edited.

Task: MIL-003#6
Task: MIL-002#1
Refs #20

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 21:41:47 +08:00
TirsvadandClaude Sonnet 5.5 bede04c841 Resolve pending commit link in RC-016
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 14:17:09 +08:00
TirsvadandClaude Sonnet 5.5 f4a397c1ec Fix tracing leak and review findings in the MIL-001 script
Switch off set -x (it printed tokens), accept a byte order mark, strip the
carriage return jq adds on Windows, return the first key without jq, rename
the boolean keys, and cite the task in the header. Add regression tests and
review record RC-016.

Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#6

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 14:17:04 +08:00
TirsvadandClaude Sonnet 5.5 d727f7ae60 Link synced milestones in the project plan
Add the Gitea milestone links (ids 43 to 45) to the Gateway Schedule after
the issue sync: MIL-001 -> #3 to #8, MIL-002 -> #9 to #14,
MIL-003 -> #15 to #20.

Refs: #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 13:49:30 +08:00
TirsvadandClaude Sonnet 5.5 bc90f10151 Resolve pending commit links in planning documents
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 13:41:48 +08:00
TirsvadandClaude Sonnet 5.5 02875aee5f Accept planning baseline and UC-001 artifacts
Add the Use Case Diagram, Domain Model (use case and project), Dictionary,
Operation Contract, Sequence Diagram, review records RC-001 to RC-015 and
the Traceability Matrix. Split US-001 into one story per milestone, make
GitHub optional (AGPL license applied when chosen), and accept BC-001,
SA-001, PP-001, UCD-001, US-001, UC-001, SSD-001, DM-001, DM-002, OC-001,
SD-001, DICT-001 and MIL-001 to MIL-003 after review.

Refs: no issues synced yet (sync-project.sh dry run only)

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 13:41:36 +08:00
TirsvadandClaude Sonnet 5.5 fa3beaf1c1 Point commit links at the pushed planning commit
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-05 12:32:32 +08:00
Tirsvad 424f14f4f5 Plan RepoFoundry: business case, stakeholders, plan, milestones, UC-001
Add the planning baseline for RepoFoundry (create-project.sh), which
creates GitHub and Gitea repositories, a Gitea -> GitHub push mirror and
a local project with the SQA-QC-Framework.

- BC-001 Business Case and SA-001 Stakeholder Analysis (S01, S02, S03)
- PP-001 Project Plan: three phases, 2026-10-05 to 2026-11-13 (proposed)
- MIL-001 Foundation, MIL-002 Repositories and Mirror,
  MIL-003 Scaffold and Release, with 18 task rows
- US-001, UC-001 "Create a new project" and SSD-001
- Registry: PO language en; PP, MIL, US, UC and SSD rows added

Decisions recorded: origin uses HTTPS from GITEA_URL unless the SSH test
on port 10022 passes; S01 and S02 are held by one person for now.

Refs: no issues synced yet (sync-project.sh dry run only)
2026-10-05 12:30:29 +08:00