- Review records RC-022 to RC-030 are Accepted
- The documents they review are set to Accepted (previous rows Deprecated)
- RC-028 and RC-029: Go-with-conditions becomes Go; the two action items are closed
- OC-001, SD-001 and DCD-001 carry a note that the UC-002 documents supersede the startProjectCreation signature
- MIL-006: the AGPL-3.0 default needs GitHub and a public project
- MIL-007: fetch the framework's own submodules (qc); start through a command link; README usage
- UC-002 with SSD, DM, OC, SD and DCD; US-001.07 and US-002
- Reconcile the project DM, DCD, dictionary, use case diagram and traceability matrix
- Review records RC-022 to RC-028
Add the Use Case Diagram, Domain Model (use case and project), Dictionary,
Operation Contract, Sequence Diagram, review records RC-001 to RC-015 and
the Traceability Matrix. Split US-001 into one story per milestone, make
GitHub optional (AGPL license applied when chosen), and accept BC-001,
SA-001, PP-001, UCD-001, US-001, UC-001, SSD-001, DM-001, DM-002, OC-001,
SD-001, DICT-001 and MIL-001 to MIL-003 after review.
Refs: no issues synced yet (sync-project.sh dry run only)
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>