Plan MIL-004: project details preset in config.env
Add objective 8 to the Business Case, US-001.04, extensions 3a and 3b of UC-001 and the matching SSD, OC, SD, DM-001 and DM-002 notes. Add the phase to the Project Plan and the milestone MIL-004 with eight Go/No-Go criteria and five tasks (issues #27 to #31). Review recorded in RC-018. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
This commit is contained in:
+2
-3
@@ -9,8 +9,8 @@
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-05 | Rejected | Jens Tirsvad Nielsen | S02 | Initial version | [424f14f] |
|
||||
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S02 | Optional GitHub; choosing GitHub applies the AGPL license to the Gitea repository<br>Cited OC-001 and DM-001 | [02875ae] |
|
||||
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S02 | Parameters may come from config.env; the message is unchanged | pending |
|
||||
|
||||
---
|
||||
|
||||
@@ -37,7 +37,7 @@ S --> A : creation summary
|
||||
| Step | Message | Parameters | Return | Use case step |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| 1 | startProjectCreation | none | prompts for project details (after configuration and tool checks) | 1, 2 |
|
||||
| 2 | provideProjectDetails | name, description, visibility, giteaOwner, githubOwner (optional; given means GitHub is chosen and the Gitea repository gets the AGPL license; omitted means no GitHub and no license), directory, enablePlanGate | checks passed, then a creation summary | 3 to 10 |
|
||||
| 2 | provideProjectDetails | name, description, visibility, giteaOwner, githubOwner (optional; given means GitHub is chosen and the Gitea repository gets the AGPL license; omitted means no GitHub and no license), directory, enablePlanGate (each of these may come from `config.env` instead of the Maintainer; the message is unchanged) | checks passed, then a creation summary | 3 to 10 |
|
||||
|
||||
Steps 4 to 9 are internal to the system, so one operation covers them. A consent question (step 8a, 9a, 9b) is a prompt from the system and is out of scope for this diagram; failure flows are out of scope here.
|
||||
|
||||
@@ -50,5 +50,4 @@ The system is one script run. It starts with the first operation and ends after
|
||||
[UC-001]: ./uc.md
|
||||
[DM-001]: ./dm.md
|
||||
[OC-001]: ./oc.md
|
||||
[424f14f]: https://git.tirsystem.com/TirSystem-BashScript/repo_foundry/commit/424f14f4f5577bb47fea41c8f3a655dca953e6d8
|
||||
[02875ae]: https://git.tirsystem.com/TirSystem-BashScript/repo_foundry/commit/02875aee5f2953473924074eea0056eb31af6b7a
|
||||
|
||||
Reference in New Issue
Block a user